4113 Circletree Loop
Austin, TX 78731
4113 Circletree Loop: 3 projects on record
City of Austin lists 3 filings across 3 projects at 4113 Circletree Loop, Austin, TX 78731 since February 2, 2024. The most recent, filed June 23, 2025, covers: “Request to disconnect - replacement of existing 100a meter can with updated 200a lever bypass meter can. installation of 200a service rated automatic transfer switch 24kw whole home generator additional grounding type 2 surge protection”.
Compiled from City of Austin records · updated Jun 23, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 23, 2025
- since Feb 2, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsRequest to disconnect - replacement of existing 100a meter can with updated 200a lever bypass meter can. installation of 200a service rated automatic transfer switch 24kw whole home generator additional grounding type 2 surge protection
Request to disconnect - replacement of existing 100a meter can with updated 200a lever bypass meter can. installation of 200a service rated automatic transfer switch 24kw whole home generator additional grounding type 2 surge protection
City of Austin permitElectrical PermitFinal- Record
- 2025-076805 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Run 1 black iron pipe to generator location
Run 1 black iron pipe to generator location
City of Austin permitPlumbing PermitFinal- Record
- 2025-073411 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of mini-split system
Replacement of mini-split system
City of Austin permitMechanical PermitFinal- Record
- 2024-005902 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4113 Circletree Loop
What is being built at 4113 Circletree Loop?
The latest filing (City of Austin permit 2025-076805 EP, June 23, 2025) covers request to disconnect - replacement of existing 100a meter can with updated 200a lever bypass meter can. installation of 200a service rated automatic transfer switch 24kw whole home generator additional grounding type 2 surge protection.
How many permits and filings does 4113 Circletree Loop have?
3 filings across 3 projects, from February 2, 2024 to June 23, 2025.
Is there other construction near 4113 Circletree Loop?
Yes. Nearby filings include 4115 Circletree Loop (base: installing a backup battery system and additional meter socket, Sep 4, 2026); 7109 Waterline Rd (irrigation system, Dec 4, 2023); 7201 Waterline Rd (base: installing a backup battery system and additional meter socket, Sep 18, 2026).
How do I get alerts for new permits at 4113 Circletree Loop?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 4115 Circletree LoopSep 4, 2026Base: installing a backup battery system and additional meter socket · 35 m away
- 7109 Waterline RdDec 4, 2023Irrigation system · 41 m away
- 7201 Waterline RdSep 18, 2026Base: installing a backup battery system and additional meter socket · 47 m away
- 4108 Circletree LoopOct 22, 2026Tunnel under foundation to replace 120 feet of cast iron for 3 full bathrooms kitchen and washer drain. there will be 2 access holes one in the garage area 2 feet by 2 feet access and the second will be done were the drain line exits the foundation in the front of the home. sewer line will be replaced from the the home to the city tap connection total length of sewer line is approximately 55 to 60 feet long that runs to the front left corner of the property · 61 m away
- 7203 Waterline RdFeb 6, 2025Express: replace 2 windows (like for like) · 61 m away
- 4107 Circletree LoopAug 6, 2026Upgrade of existing overhead electrical service to 200 amp 120/240 volt and current codes and standards · 74 m away
- 4107 Cat Hollow DrDec 31, 2024Tunnel under foundation to repair drain lines located at washing machine and kitchen. we will have 2 access holes around perimeter 1 by clean out and the other on back side of house by washing machine · 83 m away
- 7205 Waterline RdMar 11, 2024Install evse · 85 m away
- 4103 Cat Hollow DrJan 4, 2026Tunnel under the foundation to replace the cast-iron piping in the bathroom and kitchen with sch 40 pvc. there will be (2-3) access holes on the front right and left sides of the house · 103 m away
- 7101 Waterline RdAug 29, 2024Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 4205 Prickly Pear DrDec 21, 2023Express: replace 1 window like for like · 129 m away
- 7100 Waterline RdJun 16, 2025Run 10 of 1 black iron pipe to generator · 134 m away