7101 Waterline Rd
Austin, TX 78731
7101 Waterline Rd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7101 Waterline Rd, Austin, TX 78731. The most recent, filed August 29, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 29, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Aug 29, 2024
- since Aug 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 18, 2024
- IssuedAug 29, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 4, 2024
Passed final inspection Sep 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-105065 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace main service line from water meter to house
Replace main service line from water meter to house
City of Austin permitPlumbing PermitFinal- Record
- 2023-084216 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7101 Waterline Rd
What is being built at 7101 Waterline Rd?
The latest filing (City of Austin permit 2024-105065 MP, August 29, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 7101 Waterline Rd have?
2 filings across 2 projects, from August 29, 2024 to August 29, 2024.
Is there other construction near 7101 Waterline Rd?
Yes. Nearby filings include 7100 Waterline Rd (run 10 of 1 black iron pipe to generator, Jun 16, 2025); 4107 Circletree Loop (upgrade of existing overhead electrical service to 200 amp 120/240 volt and current codes and standards, Aug 6, 2026); 4107 Far West Blvd (installation of solar panels, Jun 26, 2024).
How do I get alerts for new permits at 7101 Waterline Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78731- 7100 Waterline RdJun 16, 2025Run 10 of 1 black iron pipe to generator · 42 m away
- 4107 Circletree LoopAug 6, 2026Upgrade of existing overhead electrical service to 200 amp 120/240 volt and current codes and standards · 65 m away
- 4107 Far West BlvdJun 26, 2024Installation of solar panels · 78 m away
- 4203 Far West BlvdOct 26, 2026Add cased openings within the center wall on the first level into the living room and pantry. expand the pantry for more cabinets. add a wash sink in the level 1 laundry room. expand the primary bathroom to have two vanity sinks from one and walk in shower. bring electrical and plumbing fixtures up to date · 91 m away
- 7109 Waterline RdDec 4, 2023Irrigation system · 100 m away
- 4200 North Hills DrMay 13, 2024Kitchen remodel new countertops cabinetry and move sink · 104 m away
- 7100 Mesa DrJul 24, 2026Base: installing a backup battery system and additional meter socket · 107 m away
- 7104 Mesa DrJan 1, 2026New pool spa and concrete deck · 111 m away
- 4205 Venado DrApr 30, 2024New inground pool · 116 m away
- 4202 North Hills DrMay 14, 2026Old cast iron pipes are allowing mud in sewer line do to multiple cracks and breaks causing restrooms to clog. will tunnel from front right sewercleanout and to replace 10-15 foot section to try and restore flow · 119 m away
- 4113 Circletree LoopJun 23, 2025Request to disconnect - replacement of existing 100a meter can with updated 200a lever bypass meter can. installation of 200a service rated automatic transfer switch 24kw whole home generator additional grounding type 2 surge protection · 126 m away
- 4104 North Hills DrJun 25, 2026Addition/remodel. addition of a screened patio to rear of existing 2-story single family residence. addition of nooks in 2nd floor bedrooms (within existing roofline). comprehensive interior remodel including bathrooms and kitchen. refinish exterior surface. install new ac units. revision 1: increase ceiling height for most of the first floor · 129 m away