1201 Echo Ln
Austin, TX 78745
1201 Echo Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1201 Echo Ln, Austin, TX 78745. The most recent, filed March 4, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system”.
Compiled from City of Austin records · updated Mar 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2025
- since Mar 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system
Replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system
City of Austin permitMechanical PermitExpired- Record
- 2025-020313 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1201 Echo Ln
What is being built at 1201 Echo Ln?
The latest filing (City of Austin permit 2025-020313 MP, March 4, 2025) covers replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system.
How many permits and filings does 1201 Echo Ln have?
1 filing across 1 project, from March 4, 2025 to March 4, 2025.
Is there other construction near 1201 Echo Ln?
Yes. Nearby filings include 1204 Stoneoak Ln (upgrade main service from 125a to 200a ug, Jan 18, 2024); 1118 Stoneoak Ln (replacement of complete existing central heat and air system with or without duct work, Aug 25, 2024); 1118 Echo Ln (main panel changeout, Jul 9, 2026).
How do I get alerts for new permits at 1201 Echo Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1204 Stoneoak LnJan 18, 2024Upgrade main service from 125a to 200a ug · 48 m away
- 1118 Stoneoak LnAug 25, 2024Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 1118 Echo LnJul 9, 2026Main panel changeout · 64 m away
- 1115 Echo LnMar 9, 2025Excavate 15 trench to repair main sewer line in yard · 74 m away
- 1121 Stoneoak LnNov 10, 2026Install of gas line · 80 m away
- 6800 Meadow RunFeb 19, 2024New artists studio addition with bedroom loft slab on grade wd and cement board with asphalt shingle roofing revision - add new cleanout · 82 m away
- 6804 Meadow RunSep 10, 2026Upgrade existing electrical underground service to a new 200 amp underground service. existing location · 96 m away
- 1210 Echo LnApr 9, 2026Tunnel under home 10ft to repair broken bathtub p trap and pvc drain · 101 m away
- 1202 Hidden Hill CirApr 2, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 110 m away
- 1206 Hidden Hill CirJul 14, 2025Adding 6.64 kw solar array (16 panels) to an existing system on a residential roof · 117 m away
- 1212 Echo LnNov 20, 2025Replacing sewer line form property line to clean-out at house. 60 feet from the house to the property line. it is a large corner lot. the sewer runs at an angle across the front yard · 117 m away
- 7010 Crosswood DrJun 12, 2025**panel replacement** per ec agent: meter work will be done as well · 123 m away