1118 Stoneoak Ln
Austin, TX 78745
1118 Stoneoak Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1118 Stoneoak Ln, Austin, TX 78745 since August 12, 2024. The most recent, filed August 25, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Aug 25, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Aug 25, 2024
- since Aug 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 19, 2024
- IssuedAug 25, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 28, 2024
Passed final inspection Aug 28, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-105793 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace/repair gfci devices ac disconnect caulk panel wiring in garage breaker blanks
Replace/repair gfci devices ac disconnect caulk panel wiring in garage breaker blanks
City of Austin permitElectrical PermitFinal- Record
- 2024-099430 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1118 Stoneoak Ln
What is being built at 1118 Stoneoak Ln?
The latest filing (City of Austin permit 2024-105793 MP, August 25, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1118 Stoneoak Ln have?
2 filings across 2 projects, from August 12, 2024 to August 25, 2024.
Is there other construction near 1118 Stoneoak Ln?
Yes. Nearby filings include 1201 Echo Ln (replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system, Mar 4, 2025); 1115 Echo Ln (excavate 15 trench to repair main sewer line in yard, Mar 9, 2025); 1121 Stoneoak Ln (install of gas line, Nov 10, 2026).
How do I get alerts for new permits at 1118 Stoneoak Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 1201 Echo LnMar 4, 2025Replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new single speed goodman system · 48 m away
- 1115 Echo LnMar 9, 2025Excavate 15 trench to repair main sewer line in yard · 52 m away
- 1121 Stoneoak LnNov 10, 2026Install of gas line · 53 m away
- 1204 Stoneoak LnJan 18, 2024Upgrade main service from 125a to 200a ug · 75 m away
- 7010 Crosswood DrJun 12, 2025**panel replacement** per ec agent: meter work will be done as well · 81 m away
- 1118 Echo LnJul 9, 2026Main panel changeout · 85 m away
- 1202 Hidden Hill CirApr 2, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton vertical gas system · 88 m away
- 1206 Hidden Hill CirJul 14, 2025Adding 6.64 kw solar array (16 panels) to an existing system on a residential roof · 109 m away
- 1110 Echo LnSep 20, 2024Not pre-plumbed water softener install · 116 m away
- 7004 Crosswood DrSep 18, 2025Replacement of complete existing central heat and air system with or without duct work removal of old system. replacing with new lennox 2.5 ton · 116 m away
- 1120 Echo LnMar 19, 2026Upgrade service on house · 120 m away
- 6800 Meadow RunFeb 19, 2024New artists studio addition with bedroom loft slab on grade wd and cement board with asphalt shingle roofing revision - add new cleanout · 121 m away