2012 Jones Rd
Austin, TX 78745
2012 Jones Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2012 Jones Rd, Austin, TX 78745. The most recent, filed August 5, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement”.
Compiled from City of Austin records · updated Aug 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2025
- since Aug 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement
Replacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement
City of Austin permitMechanical PermitFinal- Record
- 2025-092577 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2012 Jones Rd
What is being built at 2012 Jones Rd?
The latest filing (City of Austin permit 2025-092577 MP, August 5, 2025) covers replacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement.
How many permits and filings does 2012 Jones Rd have?
1 filing across 1 project, from August 5, 2025 to August 5, 2025.
Is there other construction near 2012 Jones Rd?
Yes. Nearby filings include 5101 Plumas Ln (replacing outside sewer yard line, Oct 21, 2026); 5103 Plumas Ln (90 tunnel below the foundation to replace entire cast-iron drain system. one access hole on each side of the home (4), May 23, 2024); 5009 Buckskin Pass (tunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout, Aug 22, 2024).
How do I get alerts for new permits at 2012 Jones Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5101 Plumas LnOct 21, 2026Replacing outside sewer yard line · 55 m away
- 5103 Plumas LnMay 23, 202490 tunnel below the foundation to replace entire cast-iron drain system. one access hole on each side of the home (4) · 73 m away
- 5009 Buckskin PassAug 22, 2024Tunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout · 75 m away
- 2008 Oakglen DrFeb 13, 2020Oakglen park sec 1 lot 6 · 90 m away
- 5007 Buckskin PassOct 7, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton vertical gas hvac system changeout with accessible duct system replacement like for like · 98 m away
- 2006 Oakglen DrJan 21, 2022Oakglen park sec 1 lot 6-7 · 109 m away
- 5008 Buckskin PassSep 14, 2026Replacement of an existing water heater replacing 50 gal natural gas standard height water heater located in the laundry room · 114 m away
- 2001 Jones RdSep 13, 2026Tunnel under house and replace all the drains line to the bottom of the slab · 122 m away
- 5003 Buckskin PassMar 12, 2024Sewer line repair · 149 m away
- 2203 Remuda TrlMar 3, 202690 foot tunnel starting at homeowner cleanout underneath home and following to furthest restroom per pc · 155 m away
- 5103 Woodgreen CvAug 27, 2026Addition and remodel add sunroom to the existing house build cabana in the back enlarge the kitchen · 156 m away
- 2005 Oakglen DrOct 22, 2025Upgrade main electrical service to 200amps · 158 m away