5009 Buckskin Pass
Austin, TX 78745
5009 Buckskin Pass: 1 project on record
City of Austin lists 1 filing across 1 project at 5009 Buckskin Pass, Austin, TX 78745. The most recent, filed August 22, 2024, covers: “Tunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout”.
Compiled from City of Austin records · updated Aug 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2024
- since Aug 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout
- AppliedAug 16, 2024
- IssuedAug 22, 2024
- WorkAug '24 – Sep '24
- Final inspectionSep 20, 2024
Passed final inspection Sep 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout
Tunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout
City of Austin permitPlumbing PermitFinal- Record
- 2024-104477 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5009 Buckskin Pass
What is being built at 5009 Buckskin Pass?
The latest filing (City of Austin permit 2024-104477 PP, August 22, 2024) covers tunnel from exterior of home and under foundation to replace cast iron up to exterior cleanout.
How many permits and filings does 5009 Buckskin Pass have?
1 filing across 1 project, from August 22, 2024 to August 22, 2024.
Is there other construction near 5009 Buckskin Pass?
Yes. Nearby filings include 5007 Buckskin Pass (replacement of complete existing central heat and air system with or without duct work 4 ton vertical gas hvac system changeout with accessible duct system replacement like for like, Oct 7, 2025); 5008 Buckskin Pass (replacement of an existing water heater replacing 50 gal natural gas standard height water heater located in the laundry room, Sep 14, 2026); 2012 Jones Rd (replacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement, Aug 5, 2025).
How do I get alerts for new permits at 5009 Buckskin Pass?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 5007 Buckskin PassOct 7, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton vertical gas hvac system changeout with accessible duct system replacement like for like · 27 m away
- 5008 Buckskin PassSep 14, 2026Replacement of an existing water heater replacing 50 gal natural gas standard height water heater located in the laundry room · 54 m away
- 2012 Jones RdAug 5, 2025Replacement of complete existing central heat and air system with or without duct work marcus 2.5 ton gas replacement · 75 m away
- 5003 Buckskin PassMar 12, 2024Sewer line repair · 82 m away
- 2203 Remuda TrlMar 3, 202690 foot tunnel starting at homeowner cleanout underneath home and following to furthest restroom per pc · 86 m away
- 5101 Plumas LnOct 21, 2026Replacing outside sewer yard line · 88 m away
- 5103 Plumas LnMay 23, 202490 tunnel below the foundation to replace entire cast-iron drain system. one access hole on each side of the home (4) · 108 m away
- 5103 Woodgreen CvAug 27, 2026Addition and remodel add sunroom to the existing house build cabana in the back enlarge the kitchen · 120 m away
- 5000 Buckskin PassSep 17, 202548 tunnel to expose broken cast iron 3x2 wye that goes to the kitchen · 124 m away
- 4911 Buckskin PassApr 29, 2026Tunnel under foundation approx 25f-35ft to replace cast iron drain system up to bottom of foundation. trench out existing sewer yard line and replace from cleanout out to city tap location · 132 m away
- 2008 Oakglen DrFeb 13, 2020Oakglen park sec 1 lot 6 · 144 m away
- 2209 Remuda TrlAug 19, 2025Reconfigure kitchen and bath new linen closet update primary bath new windows and exterior doors · 155 m away