2406 Berkeley Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2406 Berkeley Ave, Austin, TX 78745. The most recent, filed April 17, 2024, covers: “Tunnel to repair broken waste piping below the slab with a tunnel”.
Compiled from City of Austin records · updated Apr 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2024
- since Apr 17, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectTunnel to repair broken waste piping below the slab with a tunnel
Tunnel to repair broken waste piping below the slab with a tunnel
City of Austin permitPlumbing PermitExpired- Record
- 2024-047734 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2406 Berkeley Ave
What is being built at 2406 Berkeley Ave?
The latest filing (City of Austin permit 2024-047734 PP, April 17, 2024) covers tunnel to repair broken waste piping below the slab with a tunnel.
How many permits and filings does 2406 Berkeley Ave have?
1 filing across 1 project, from April 17, 2024 to April 17, 2024.
Is there other construction near 2406 Berkeley Ave?
Yes. Nearby filings include 2404 Berkeley Ave (we will be performing a concrete breakout in unit a to access and expose the damaged kitchen drain line. an additional concrete breakout will be performed in front of the toilet in the unit a master bathroom to gain access to the toilet venting system. from this access point an approximately 8-foot tunnel will be excavated beneath the slab to fully expose the damaged venting combination fitting and allow for proper repair. lastly a concrete breakout will be performed in the living room to expose the damaged combination fitting serving the laundry and kitchen drain lines in unit b, Sep 11, 2026); 6222 Hillston Dr (complete service upgrade to 200 amps, Feb 27, 2024); 6225 Hillston Dr (new irrigation system, Jun 26, 2026).
How do I get alerts for new permits at 2406 Berkeley Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 2404 Berkeley AveSep 11, 2026We will be performing a concrete breakout in unit a to access and expose the damaged kitchen drain line. an additional concrete breakout will be performed in front of the toilet in the unit a master bathroom to gain access to the toilet venting system. from this access point an approximately 8-foot tunnel will be excavated beneath the slab to fully expose the damaged venting combination fitting and allow for proper repair. lastly a concrete breakout will be performed in the living room to expose the damaged combination fitting serving the laundry and kitchen drain lines in unit b · 27 m away
- 6222 Hillston DrFeb 27, 2024Complete service upgrade to 200 amps · 60 m away
- 6225 Hillston DrJun 26, 2026New irrigation system · 73 m away
- 6220 Hillston DrMay 13, 2026Replace wire between the load side of the existing electric meter and main breaker. install main breaker in correct position in load center. install main breaker retainer kit on main breaker · 79 m away
- 2407 Berkeley AveMar 2, 2007Berkeley united methodist church · 82 m away
- 6218 Hillston DrMar 24, 2026Replace house sewer main to city tap · 97 m away
- 6219 Hillston DrOct 4, 2024Pressure test gas system and repair if needed · 107 m away
- 6303 Berkeley CvApr 10, 2025Request to disconnect 150 amp main panel replacement like for like · 128 m away
- 6214 Hillston DrOct 20, 2026Replacement of complete existing central heat and air system with or without duct work replacement of an hvac system · 132 m away
- 2502 Mc Gregor DrMar 24, 2025Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 2512 Baxter DrMay 13, 2026Express: foundation repair · 136 m away
- 6305 Berkeley CvAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 139 m away