2407 Berkeley Ave
Austin, TX 78745
2407 Berkeley Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2407 Berkeley Ave, Austin, TX 78745. The most recent, filed March 2, 2007, covers: “Berkeley united methodist church”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2407 Berkeley Ave
What is being built at 2407 Berkeley Ave?
The latest filing (City of Austin case 154761, March 2, 2007) covers berkeley united methodist church.
How many permits and filings does 2407 Berkeley Ave have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 2407 Berkeley Ave?
Yes. Nearby filings include 6305 Berkeley Cv (replacement of complete existing central heat and air system with or without duct work, Aug 28, 2024); 6303 Berkeley Cv (request to disconnect 150 amp main panel replacement like for like, Apr 10, 2025); 2406 Berkeley Ave (tunnel to repair broken waste piping below the slab with a tunnel, Apr 17, 2024).
How do I get alerts for new permits at 2407 Berkeley Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78745- 6305 Berkeley CvAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 6303 Berkeley CvApr 10, 2025Request to disconnect 150 amp main panel replacement like for like · 80 m away
- 2406 Berkeley AveApr 17, 2024Tunnel to repair broken waste piping below the slab with a tunnel · 82 m away
- 2404 Berkeley AveSep 11, 2026We will be performing a concrete breakout in unit a to access and expose the damaged kitchen drain line. an additional concrete breakout will be performed in front of the toilet in the unit a master bathroom to gain access to the toilet venting system. from this access point an approximately 8-foot tunnel will be excavated beneath the slab to fully expose the damaged venting combination fitting and allow for proper repair. lastly a concrete breakout will be performed in the living room to expose the damaged combination fitting serving the laundry and kitchen drain lines in unit b · 89 m away
- 6304 Berkeley CvAug 27, 2026100 trench to replace yard sewer and 10 tunnel below the foundation to correct slope on the main drain. 1 access hole in front · 102 m away
- 2412 Aldford DrMar 12, 2026Interior remodel (reconfigure beds and baths and kitchen) full scope attached · 120 m away
- 6222 Hillston DrFeb 27, 2024Complete service upgrade to 200 amps · 131 m away
- 2507 Berkeley AveJun 11, 2024Install tank-less type water heater · 134 m away
- 2502 Mc Gregor DrMar 24, 2025Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 6220 Hillston DrMay 13, 2026Replace wire between the load side of the existing electric meter and main breaker. install main breaker in correct position in load center. install main breaker retainer kit on main breaker · 149 m away
- 2309 Berkeley AveMay 11, 2026Code compliance correction : replace (3) exterior flood lights at building. 18 with (3) new full cut off wall pack lights power is existing · 154 m away
- 6225 Hillston DrJun 26, 2026New irrigation system · 155 m away