2309 Berkeley Ave
Austin, TX 78745
Three exterior lights to be replaced at 2309 Berkeley Ave
An electrical permit covers replacing three exterior flood lights at the building with full-cutoff wall-pack lights, using existing power. The City of Austin permit was filed on May 11, 2026, and is marked final.
Summarized from City of Austin records · updated May 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 11, 2026
- since May 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectCode compliance correction : replace (3) exterior flood lights at building. 18 with (3) new full cut off wall pack lights power is existing
Code compliance correction : replace (3) exterior flood lights at building. 18 with (3) new full cut off wall pack lights power is existing
City of Austin permitElectrical PermitFinal- Record
- 2026-057879 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2309 Berkeley Ave
What work is permitted at 2309 Berkeley Ave?
City of Austin permit 2026-057879 EP covers replacing three exterior flood lights with three full-cutoff wall-pack lights.
When was the permit for 2309 Berkeley Ave filed?
The electrical permit was filed on May 11, 2026.
Is the 2309 Berkeley Ave permit final?
Yes. The City of Austin lists permit 2026-057879 EP as final.
Does the lighting work at 2309 Berkeley Ave need new power?
The permit description says the existing power will be used.
Is a new building being built at 2309 Berkeley Ave?
The listed permit is for replacing exterior lights, not for new building construction.
Also being built nearby
All of 78745- 2200 Berkeley Ave · Austin Independent School DistrictJul 9, 2026Cunningham install shade structures at existing school. (shade #2) · 97 m away
- 6400 Menchaca RdSep 8, 2009Fbw subdivision, resubdivision of (plat vacation) · 137 m away
- 2404 Berkeley AveSep 11, 2026We will be performing a concrete breakout in unit a to access and expose the damaged kitchen drain line. an additional concrete breakout will be performed in front of the toilet in the unit a master bathroom to gain access to the toilet venting system. from this access point an approximately 8-foot tunnel will be excavated beneath the slab to fully expose the damaged venting combination fitting and allow for proper repair. lastly a concrete breakout will be performed in the living room to expose the damaged combination fitting serving the laundry and kitchen drain lines in unit b · 146 m away
- 2407 Berkeley AveMar 2, 2007Berkeley united methodist church · 154 m away
- 2406 Berkeley AveApr 17, 2024Tunnel to repair broken waste piping below the slab with a tunnel · 168 m away
- 6306 Menchaca RdFeb 6, 2024Interior remodel for existing convenience store (food sales) replacing existing 7-eleven trade equipment · 183 m away
- 2412 Aldford DrMar 12, 2026Interior remodel (reconfigure beds and baths and kitchen) full scope attached · 199 m away
- 6225 Hillston DrJun 26, 2026New irrigation system · 201 m away
- 6300 Menchaca RdMar 2, 2007Quick lube storage building · 206 m away
- 6305 Berkeley CvAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 222 m away
- 6222 Hillston DrFeb 27, 2024Complete service upgrade to 200 amps · 226 m away
- 6500 Menchaca RdMar 30, 20196500 manchaca · 227 m away