100 Pascal Ln
Austin, TX 78746
New boat dock and tram planned at 100 Pascal Ln
City of Austin records indicate a new boat dock and tram at 100 Pascal Ln, with demolition of the existing dock. An electrical permit for the work was finalized March 19, 2025, and a site plan for the Pascal Lane Boat Dock was approved and released October 9, 2026.
Summarized from City of Austin records · updated Oct 9, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Oct 9, 2026
- since May 3, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsConstruct new boat dock & tram including the demolition of the existing dock which will include electrical
Construct new boat dock & tram including the demolition of the existing dock which will include electrical
City of Austin permitElectrical PermitFinal- Record
- 2024-043900 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We will be installing 86 modules 400 watt modules system size is 34.4 kw
We will be installing 86 modules 400 watt modules system size is 34.4 kw
City of Austin permitElectrical PermitFinal- Record
- 2023-078155 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Temporary disconnect needed for solar project at 100 pascal lane approved solar permit is ep 2023-078155
Temporary disconnect needed for solar project at 100 pascal lane approved solar permit is ep 2023-078155
City of Austin permitElectrical PermitFinal- Record
- 2024-088182 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new boat dock & tram including the demolition of the existing dock which will include electrical
Construct new boat dock & tram including the demolition of the existing dock which will include electrical
City of Austin permitBuilding PermitFinal- Record
- 2024-043900 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 100 Pascal Ln
What is being built at 100 Pascal Ln in Austin?
City records describe a new boat dock and tram, along with demolition of the existing dock. The site plan case is listed as approved and released.
When was the boat dock project permitted?
The electrical permit, 2024-043900 EP, was finalized March 19, 2025. The Pascal Lane Boat Dock site plan, case 13097739, was approved and released October 9, 2026.
Is the existing dock at 100 Pascal Ln being replaced?
The electrical permit description says the work includes demolition of the existing dock and construction of a new boat dock and tram.
What does the Pascal Lane Boat Dock permit include?
The City of Austin permit description lists a new boat dock and tram, demolition of the existing dock, and electrical work.
Has the boat dock plan at 100 Pascal Ln been approved?
Yes. City of Austin site plan case 13097739 was marked approved and released on October 9, 2026.
Also being built nearby
All of 78746- 102 Pascal LnJan 28, 2009Davenport west pud tract c-3 sec 2, the point at rob roy, amended plat of lots 6 — davenport west pud tract c-3 sec 2, the point at rob roy, amended plat of lots 6 & 7 · 54 m away
- 103 Pascal LnNov 9, 2026Replacement of complete existing central heat and air system with or without duct work · 146 m away
- 101 Pascal LnFeb 6, 2009Point at rob roy, amended plat of lots 9 & 10, davenport west p.u.d. tract c-3, — point at rob roy, amended plat of lots 9 & 10, davenport west p.u.d. tract c-3, section two · 163 m away
- 91 Pascal LnJul 7, 2025Express: replace three windows like for like · 241 m away
- 6902 Pascal CtSep 4, 2024Request to disconnect install 200 amp ats and 26kw generator · 249 m away
- 6903 Pascal CtAug 26, 2026Replacement of complete existing central heat and air system with or without duct work · 280 m away
- 2403 Manana StMar 2, 2007Helms boat dock **expired · 303 m away
- 2401 Manana StMay 9, 20082401 manana street · 311 m away
- 2307 Manana StFeb 4, 2021Hodge boat dock · 319 m away
- 2305 Manana StNov 9, 20262305 manana st. boat dock · 322 m away
- 2501 Tydings CvMar 2, 2007Brinkman residence boat dock & lifts · 325 m away
- 2303 Manana StSep 10, 2026Etj upgrade disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps no installation of generator · 327 m away