groundranger
Active · latest filing Sep 2026Commercial

2303 Manana St

Austin, TX 78730

Electrical meter and transfer-switch upgrade at 2303 Manana St

An electrical upgrade at 2303 Manana St was permitted on September 10, 2026, including a new revenue meter and two ATS units. The active permit says no generator will be installed; a separate permit for dock work is expired.

Summarized from City of Austin records · updated Sep 10, 2026

Projects
6
6 filings
Latest filing
Sep 10, 2026
since Mar 2, 2007
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Etj upgrade disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps no installation of generator

  1. AppliedSep 2, 2026
  2. IssuedSep 10, 2026
  3. WorkSep '26 – Mar '27
  4. Final inspection
39% through of the permit windowSep 10, 2026 → Mar 9, 2027

1 contact on this project · 1 phone number

Permit & project history

6 projects
  1. Etj upgrade disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps no installation of generator

    Etj upgrade disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps no installation of generator

    City of Austin permitElectrical PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps for 1 generac 28 kw air-cooled standby generator (model no:#g0073290)

    Disconnect/reconnect to install new revenue meter and install (2) new ats between the new revenue meter & the mdps for 1 generac 28 kw air-cooled standby generator (model no:#g0073290)

    City of Austin permitElectrical PermitWithdrawn
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Return the boat dock to its permitted design show as-built conditions and re-deck the dock per sp-02-0438ds

    Return the boat dock to its permitted design show as-built conditions and re-deck the dock per sp-02-0438ds

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. BOYCE BOAT DOCK

    Boyce boat dock

    City of Austin casesite_planApproved and Released
    Record
    220679
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2303 Manana St

What is being built at 2303 Manana St?

An active electrical permit covers a new revenue meter and two ATS units. It states that no generator installation is included.

When was the electrical work at 2303 Manana St permitted?

The active City of Austin permit, 2026-115091 EP, was filed on September 10, 2026.

Is a generator being installed at 2303 Manana St?

The active permit, 2026-115091 EP, says no generator will be installed. A separate permit filed August 10, 2026, describing a 28 kW standby generator, is withdrawn.

Is boat dock work planned at 2303 Manana St?

A City of Austin building permit filed January 13, 2025, describes returning the dock to its permitted design and redecking it. That permit, 2024-080778 BP, is expired.

What is the status of the latest permit at 2303 Manana St?

The latest record is electrical permit 2026-115091 EP, filed September 10, 2026. Its status is Active.

Also being built nearby

All of 78730
Email me when it passes final inspection