10228 Pinehurst Dr
Austin, TX 78747
10228 Pinehurst Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 10228 Pinehurst Dr, Austin, TX 78747 since February 14, 2025. The most recent, filed July 30, 2025, covers: “Replacement of an existing water heater 50 gallon gas water heater replacement”.
Compiled from City of Austin records · updated Jul 30, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jul 30, 2025
- since Feb 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsReplacement of an existing water heater 50 gallon gas water heater replacement
Replacement of an existing water heater 50 gallon gas water heater replacement
City of Austin permitPlumbing PermitFinal- Record
- 2025-084526 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work replacing of a 2 ton goodman electric system
Replacement of complete existing central heat and air system with or without duct work replacing of a 2 ton goodman electric system
City of Austin permitMechanical PermitFinal- Record
- 2025-073910 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect need to install a 200 amp ats (automatic transfer switch) to existing 200 amp service meter can to remain. no meter needed
Request to disconnect need to install a 200 amp ats (automatic transfer switch) to existing 200 amp service meter can to remain. no meter needed
City of Austin permitElectrical PermitFinal- Record
- 2025-015182 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Plumber to add ng to fuel the generator
Plumber to add ng to fuel the generator
City of Austin permitPlumbing PermitFinal- Record
- 2025-014558 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10228 Pinehurst Dr
What is being built at 10228 Pinehurst Dr?
The latest filing (City of Austin permit 2025-084526 PP, July 30, 2025) covers replacement of an existing water heater 50 gallon gas water heater replacement.
How many permits and filings does 10228 Pinehurst Dr have?
4 filings across 4 projects, from February 14, 2025 to July 30, 2025.
Is there other construction near 10228 Pinehurst Dr?
Yes. Nearby filings include 10230 Pinehurst Dr (replacement of an existing water heater replacement of water heater, May 6, 2025); 10225 Pinehurst Dr (express: re-roofing - removing 45.33 sq of concrete roof tiles and replacing with laminate shingles on main dwelling, Oct 14, 2026); 10232 Pinehurst Dr (tunnel 6 feet under home to repair drain line, Jul 31, 2026).
How do I get alerts for new permits at 10228 Pinehurst Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 10230 Pinehurst DrMay 6, 2025Replacement of an existing water heater replacement of water heater · 59 m away
- 10225 Pinehurst DrOct 14, 2026Express: re-roofing - removing 45.33 sq of concrete roof tiles and replacing with laminate shingles on main dwelling · 72 m away
- 10232 Pinehurst DrJul 31, 2026Tunnel 6 feet under home to repair drain line · 81 m away
- 10233 Pinehurst DrOct 7, 2024Replacement of an existing water heater · 104 m away
- 10212 Braemar DrMar 14, 2025Replacement of an existing water heater · 117 m away
- 10209 Braemar DrJun 1, 2026Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 10216 Pinehurst DrFeb 11, 2026Replacement of complete existing central heat and air system with or without duct work · 183 m away
- 10209 Colonial Club DrFeb 23, 2026Replacing 5 windows like for like in existing residential home · 185 m away
- 10333 Channel Island DrMay 30, 2025Replacement of complete existing central heat and air system with or without duct work · 190 m away
- 10317 Channel Island DrApr 8, 2026Ev charger installation. install 50 200 40 volt breaker in one 100 25-amp main panel using available slot. route conductors directly behind the main panel to the left interior garage wall. install the nema outlet and mount the charger adjacent to it · 194 m away
- 2500 Braemar CvNov 7, 2025Replacement of complete existing central heat and air system with or without duct work · 203 m away
- 10214 Pinehurst DrMar 13, 2026Run/ mount 14 of 1 black iron pipe to generator (no trenching) · 211 m away