10317 Channel Island Dr
Austin, TX 78747
EV charger installation permitted at 10317 Channel Island Dr
An EV charger and NEMA outlet were permitted for installation at 10317 Channel Island Dr in Austin on April 8, 2026. The City of Austin electrical permit, 2026-041364 EP, is marked final.
Summarized from City of Austin records · updated Apr 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEv charger installation. install 50 200 40 volt breaker in one 100 25-amp main panel using available slot. route conductors directly behind the main panel to the left interior garage wall. install the nema outlet and mount the charger adjacent to it
- AppliedApr 6, 2026
- IssuedApr 8, 2026
- WorkApr '26 – Jun '26
- Final inspectionJun 22, 2026
Passed final inspection Jun 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectEv charger installation. install 50 200 40 volt breaker in one 100 25-amp main panel using available slot. route conductors directly behind the main panel to the left interior garage wall. install the nema outlet and mount the charger adjacent to it
Ev charger installation. install 50 200 40 volt breaker in one 100 25-amp main panel using available slot. route conductors directly behind the main panel to the left interior garage wall. install the nema outlet and mount the charger adjacent to it
City of Austin permitElectrical PermitFinal- Record
- 2026-041364 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10317 Channel Island Dr
What is being installed at 10317 Channel Island Dr?
A City of Austin electrical permit describes installing an EV charger and a NEMA outlet at the property.
When was the EV charger permit filed for 10317 Channel Island Dr?
The permit was filed on April 8, 2026. Permit number: 2026-041364 EP.
Is the EV charger permit at 10317 Channel Island Dr final?
Yes. City of Austin permit 2026-041364 EP is marked final.
Is a new building being constructed at 10317 Channel Island Dr?
The record describes an EV charger installation, not new building construction.
What does permit 2026-041364 EP cover in Austin?
It covers installation of an EV charger, with a NEMA outlet mounted on the garage's interior wall.
Also being built nearby
All of 78747- 10316 Channel Island DrJul 1, 2024Replacement of an existing water heater · 47 m away
- 10333 Channel Island DrMay 30, 2025Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 10301 Channel Island DrAug 13, 2025Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 10229 Channel Island DrNov 10, 2026Provide and install a 200 amp 8 space panel/meter housing combo all in one unit · 80 m away
- 10225 Channel Island DrJun 30, 2026Replacement of complete existing central heat and air system with or without duct work lesvia millican: replace 5-ton like-for-like electric system · 96 m away
- 2613 National Park BlvdOct 20, 2025Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 2601 National Park BlvdJan 8, 2026Express: install 1 composite pier · 165 m away
- 10204 Wind Cave TrlMay 23, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 3 ton single stage goodman system · 177 m away
- 10201 Wind Cave TrlNov 18, 2026Express: shower to shower replacement · 180 m away
- 10413 Yellowstone DrOct 16, 2026Express: replacing 15 windows (like for like) · 187 m away
- 10228 Pinehurst DrJul 30, 2025Replacement of an existing water heater 50 gallon gas water heater replacement · 194 m away
- 10405 Yellowstone DrFeb 16, 2026Replacement of an existing water heater replace 40-gallon gas water heater · 200 m away