5912 Daly Dr
Austin, TX 78747
5912 Daly Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5912 Daly Dr, Austin, TX 78747. The most recent, filed July 2, 2025, covers: “Not pre-plumbed water softener install”.
Compiled from City of Austin records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNot pre-plumbed water softener install
Not pre-plumbed water softener install
City of Austin permitPlumbing PermitFinal- Record
- 2025-080929 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5912 Daly Dr
What is being built at 5912 Daly Dr?
The latest filing (City of Austin permit 2025-080929 PP, July 2, 2025) covers not pre-plumbed water softener install.
How many permits and filings does 5912 Daly Dr have?
1 filing across 1 project, from July 2, 2025 to July 2, 2025.
Is there other construction near 5912 Daly Dr?
Yes. Nearby filings include 11416 River Plantation Dr (install new gas line for generator, Oct 9, 2026); 11404 River Plantation Dr (perform 2 separate spot repairs on sewer line. 1st spot repair will be near retaining wall for flower bed (includes new 2-way clean out) 2nd spot repair will be made near city cleanout. both spots will include setup 811 utility locate services& mark out areas of excavation excavation (up to 5 in length & 4 in depth) at both areas of failure removal of damaged sections of pipe install new sch 40 pvc pipe sand bedding areas of repair (to minimize movement with ground shifting) leak test backfill, Apr 18, 2025); 10916 Zoeller Dr (installation of ev charger, Apr 22, 2026).
How do I get alerts for new permits at 5912 Daly Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 11416 River Plantation DrOct 9, 2026Install new gas line for generator · 187 m away
- 11404 River Plantation DrApr 18, 2025Perform 2 separate spot repairs on sewer line. 1st spot repair will be near retaining wall for flower bed (includes new 2-way clean out) 2nd spot repair will be made near city cleanout. both spots will include setup 811 utility locate services& mark out areas of excavation excavation (up to 5 in length & 4 in depth) at both areas of failure removal of damaged sections of pipe install new sch 40 pvc pipe sand bedding areas of repair (to minimize movement with ground shifting) leak test backfill · 216 m away
- 10916 Zoeller DrApr 22, 2026Installation of ev charger · 229 m away
- 5701 Lehman WayFeb 12, 2026Replacement of complete existing central heat and air system with or without duct work · 300 m away
- 10817 Players PathFeb 17, 2025Install level 2 ev charger · 309 m away
- 10908 Players PathMar 24, 2025Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw · 315 m away
- 11017 Players PathOct 14, 2026Express: foundation repair-24 steel piers · 328 m away
- 11000 Players PathAug 5, 2026Shearhart - 39-95875 install new 5.76kw rooftop solar system to existing residential only using backfed breaker only · 332 m away
- 11021 Players PathJul 22, 2025Utility disconnect/reconnect. tesla backup switch. underground service. ae. meter can does not need replacing- no espa attached · 339 m away
- 10809 Players PathDec 11, 2025Direct access to repair pvc pipe under foundation · 344 m away
- 6025 Eden DrDec 8, 2025Addition addition of deck and pergola in backyard · 377 m away
- 11109 Players PathJan 12, 2026Request to disconnect - sanchez 39-23583 - disconnect/reconnect power to tie in pv component and upgrading msp to 225 amps. 200 main breaker only · 385 m away