groundranger
Recent · latest filing Dec 2025Residential

764 Patchway Ln

Austin, TX 78748

764 Patchway Ln: 2 projects on record

City of Austin lists 2 filings across 2 projects at 764 Patchway Ln, Austin, TX 78748. The most recent, filed December 29, 2025, covers: “Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve”.

Compiled from City of Austin records · updated Dec 29, 2025

Projects
2
2 filings
Latest filing
Dec 29, 2025
since Dec 29, 2025
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve

    Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve

    Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 764 Patchway Ln

What is being built at 764 Patchway Ln?

The latest filing (City of Austin permit 2025-158972 BP, December 29, 2025) covers express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve.

How many permits and filings does 764 Patchway Ln have?

2 filings across 2 projects, from December 29, 2025 to December 29, 2025.

Is there other construction near 764 Patchway Ln?

Yes. Nearby filings include 800 Patchway Ln (new waster heater install, Sep 26, 2024); 709 Marc Taylor Dr (run 1-1/2 gas line 75 feet from meter to the back yard to serve (1) 650000 btu gas kiln, Feb 9, 2026); 8101 Huddleston Ln (express - replace 130 lf of fascia and drip edge replace 260 sq ft of soffit and 120 lf of hardie 1x4 trim paint to match replace one outlet next to sink replace one kitchen light, Aug 19, 2024).

How do I get alerts for new permits at 764 Patchway Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78748
Get alerts for 764 Patchway Ln