800 Patchway Ln
Austin, TX 78748
800 Patchway Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 800 Patchway Ln, Austin, TX 78748. The most recent, filed September 26, 2024, covers: “New waster heater install”.
Compiled from City of Austin records · updated Sep 26, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 26, 2024
- since Sep 26, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNew waster heater install
New waster heater install
City of Austin permitPlumbing PermitFinal- Record
- 2024-129077 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 800 Patchway Ln
What is being built at 800 Patchway Ln?
The latest filing (City of Austin permit 2024-129077 PP, September 26, 2024) covers new waster heater install.
How many permits and filings does 800 Patchway Ln have?
1 filing across 1 project, from September 26, 2024 to September 26, 2024.
Is there other construction near 800 Patchway Ln?
Yes. Nearby filings include 764 Patchway Ln (express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve, Dec 29, 2025); 8101 Huddleston Ln (express - replace 130 lf of fascia and drip edge replace 260 sq ft of soffit and 120 lf of hardie 1x4 trim paint to match replace one outlet next to sink replace one kitchen light, Aug 19, 2024); 8108 Tockington Way (replacement of complete existing central heat and air system with or without duct work replace furnace evaporator coil condensing unit and ductwork, Nov 2, 2024).
How do I get alerts for new permits at 800 Patchway Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 764 Patchway LnDec 29, 2025Express- replace tub to shower 1-piece prefabricated acrylic no electrical work needed replace valve with new shower valve · 14 m away
- 8101 Huddleston LnAug 19, 2024Express - replace 130 lf of fascia and drip edge replace 260 sq ft of soffit and 120 lf of hardie 1x4 trim paint to match replace one outlet next to sink replace one kitchen light · 58 m away
- 8108 Tockington WayNov 2, 2024Replacement of complete existing central heat and air system with or without duct work replace furnace evaporator coil condensing unit and ductwork · 69 m away
- 709 Marc Taylor DrFeb 9, 2026Run 1-1/2 gas line 75 feet from meter to the back yard to serve (1) 650000 btu gas kiln · 70 m away
- 715 Marc Taylor DrJul 7, 2026Installation of ev charger · 77 m away
- 707 Marc Taylor DrAug 15, 2024Replacement of complete existing central heat and air system with or without duct work · 78 m away
- 8113 Tockington WayApr 17, 2025Express: siding repair · 87 m away
- 719 Marc Taylor DrJul 3, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 703 Marc Taylor DrSep 18, 2026Replacement of an existing water heater change out of ng tanked water heater · 102 m away
- 8008 Huddleston LnMar 4, 2026Replacement of an existing water heater we are exchanging 40gal electric tank water heater for a new one like for like · 104 m away
- 8121 Tockington WayJun 17, 2026Replacement of an existing water heater gas water heater install at local home · 113 m away
- 740 Patchway LnFeb 14, 2024Replacement of an existing water heater · 125 m away