4504 Langtry Ln
Austin, TX 78749
4504 Langtry Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 4504 Langtry Ln, Austin, TX 78749. The most recent, filed August 4, 2025, covers: “The existing waterline has a compromised section due to pinching resulting in inadequate water flow to the home. full replacement of the waterline is recommended. the new line will be rerouted to avoid existing trees rather than following the current path beneath them. the total length of the new waterline is approximately 80 feet. work includes: installation of a new pressure reducing valve (prv) installation of a new main shut-off valve new connection to the meter tie-in to the existing interior water supply line warranty: this installation comes with a 6-year warranty covering parts and labor. exclusions & notes: this estimate does not include any concrete removal or repair. if heavy rock chipping or cutting is encountered during excavation we will discuss options and additional charges with the homeowner prior to proceeding. total estimate: [insert total cost or to be determined after site inspection] please contact us with any questions or to schedule the work. we appreciate the opportunity to serve you”.
Compiled from City of Austin records · updated Aug 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2025
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThe existing waterline has a compromised section due to pinching resulting in inadequate water flow to the home. full replacement of the waterline is recommended. the new line will be rerouted to avoid existing trees rather than following the current path beneath them. the total length of the new waterline is approximately 80 feet. work includes: installation of a new pressure reducing valve (prv) installation of a new main shut-off valve new connection to the meter tie-in to the existing interior water supply line warranty: this installation comes with a 6-year warranty covering parts and labor. exclusions & notes: this estimate does not include any concrete removal or repair. if heavy rock chipping or cutting is encountered during excavation we will discuss options and additional charges with the homeowner prior to proceeding. total estimate: [insert total cost or to be determined after site inspection] please contact us with any questions or to schedule the work. we appreciate the opportunity to serve you
The existing waterline has a compromised section due to pinching resulting in inadequate water flow to the home. full replacement of the waterline is recommended. the new line will be rerouted to avoid existing trees rather than following the current path beneath them. the total length of the new waterline is approximately 80 feet. work includes: installation of a new pressure reducing valve (prv) installation of a new main shut-off valve new connection to the meter tie-in to the existing interior water supply line warranty: this installation comes with a 6-year warranty covering parts and labor. exclusions & notes: this estimate does not include any concrete removal or repair. if heavy rock chipping or cutting is encountered during excavation we will discuss options and additional charges with the homeowner prior to proceeding. total estimate: [insert total cost or to be determined after site inspection] please contact us with any questions or to schedule the work. we appreciate the opportunity to serve you
City of Austin permitPlumbing PermitExpired- Record
- 2025-094860 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4504 Langtry Ln
What is being built at 4504 Langtry Ln?
The latest filing (City of Austin permit 2025-094860 PP, August 4, 2025) covers the existing waterline has a compromised section due to pinching resulting in inadequate water flow to the home. full replacement of the waterline is recommended. the new line will be rerouted to avoid existing trees rather than following the current path beneath them. the total length of the new waterline is approximately 80 feet. work includes: installation of a new pressure reducing valve (prv) installation of a new main shut-off valve new connection to the meter tie-in to the existing interior water supply line warranty: this installation comes with a 6-year warranty covering parts and labor. exclusions & notes: this estimate does not include any concrete removal or repair. if heavy rock chipping or cutting is encountered during excavation we will discuss options and additional charges with the homeowner prior to proceeding. total estimate: [insert total cost or to be determined after site inspection] please contact us with any questions or to schedule the work. we appreciate the opportunity to serve you.
How many permits and filings does 4504 Langtry Ln have?
1 filing across 1 project, from August 4, 2025 to August 4, 2025.
Is there other construction near 4504 Langtry Ln?
Yes. Nearby filings include 4502 Langtry Ln (install/replace 200 amp main breaker panel and meter can (overhead), Oct 9, 2026); 4500 Langtry Ln (replacement of complete existing central heat and air system with or without duct work, Jul 24, 2026); 6105 Yellow Rose Cv (replacement of complete existing central heat and air system with or without duct work, Dec 29, 2023).
How do I get alerts for new permits at 4504 Langtry Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 4502 Langtry LnOct 9, 2026Install/replace 200 amp main breaker panel and meter can (overhead) · 24 m away
- 4500 Langtry LnJul 24, 2026Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 6105 Yellow Rose CvDec 29, 2023Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 4503 Langtry LnJun 8, 2026Replacement of complete existing central heat and air system with or without duct work martha davids: replace 3-ton like-for-like gas system · 49 m away
- 4501 Grider PassSep 10, 2026Base: installing a backup battery system and additional meter socket · 49 m away
- 4507 Yellow Rose TrlMar 28, 2025Will re do the gas line for the pool heater that is leaking underground amd thr gas company turned off and put a lock on it they dont have gas service at the moment for the house too · 68 m away
- 4502 Yellow Rose TrlJan 12, 2024Express: window replacement (like for like) · 88 m away
- 4520 Langtry LnApr 12, 2024Install an irrigation system to permit address · 99 m away
- 4522 Langtry LnDec 29, 2023Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 4408 Yellow Rose TrlJan 6, 2025Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 4524 Langtry LnAug 26, 2026Panel and meter upgrade · 112 m away
- 6206 Adel CvMay 27, 2025Replace old existing panel meter and wire · 114 m away