6105 Yellow Rose Cv: 1 project on record

City of Austin lists 1 filing across 1 project at 6105 Yellow Rose Cv, Austin, TX 78749. The most recent, filed December 29, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Dec 29, 2023

Projects
1
1 filings
Latest filing
Dec 29, 2023
since Dec 29, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedDec 20, 2023
  2. IssuedDec 29, 2023
  3. WorkDec '23 – May '24
  4. Final inspectionMay 3, 2024

Passed final inspection May 3, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 6105 Yellow Rose Cv

What is being built at 6105 Yellow Rose Cv?

The latest filing (City of Austin permit 2023-161824 MP, December 29, 2023) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 6105 Yellow Rose Cv have?

1 filing across 1 project, from December 29, 2023 to December 29, 2023.

Is there other construction near 6105 Yellow Rose Cv?

Yes. Nearby filings include 4507 Yellow Rose Trl (will re do the gas line for the pool heater that is leaking underground amd thr gas company turned off and put a lock on it they dont have gas service at the moment for the house too, Mar 28, 2025); 4504 Langtry Ln (the existing waterline has a compromised section due to pinching resulting in inadequate water flow to the home. full replacement of the waterline is recommended. the new line will be rerouted to avoid existing trees rather than following the current path beneath them. the total length of the new waterline is approximately 80 feet. work includes: installation of a new pressure reducing valve (prv) installation of a new main shut-off valve new connection to the meter tie-in to the existing interior water supply line warranty: this installation comes with a 6-year warranty covering parts and labor. exclusions & notes: this estimate does not include any concrete removal or repair. if heavy rock chipping or cutting is encountered during excavation we will discuss options and additional charges with the homeowner prior to proceeding. total estimate: [insert total cost or to be determined after site inspection] please contact us with any questions or to schedule the work. we appreciate the opportunity to serve you, Aug 4, 2025); 4502 Langtry Ln (install/replace 200 amp main breaker panel and meter can (overhead), Oct 9, 2026).

How do I get alerts for new permits at 6105 Yellow Rose Cv?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78749
Email me when a new permit is filed