508 E 49th St
Austin, TX 78751
508 E 49th St: 3 projects on record
City of Austin lists 3 filings across 3 projects at 508 E 49th St, Austin, TX 78751 since June 18, 2025. The most recent, filed October 30, 2025, covers: “Relocate gas meter due to electrical service upgrade gas test needed”.
Compiled from City of Austin records · updated Oct 30, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Oct 30, 2025
- since Jun 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsRelocate gas meter due to electrical service upgrade gas test needed
Relocate gas meter due to electrical service upgrade gas test needed
City of Austin permitPlumbing PermitFinal- Record
- 2025-137161 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
*+request to disconnect** service rebuild 350 amps
*+request to disconnect** service rebuild 350 amps
City of Austin permitElectrical PermitFinal- Record
- 2025-098764 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install sewer and water line to backyard structure
Install sewer and water line to backyard structure
City of Austin permitPlumbing PermitExpired- Record
- 2025-073529 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 508 E 49th St
What is being built at 508 E 49th St?
The latest filing (City of Austin permit 2025-137161 PP, October 30, 2025) covers relocate gas meter due to electrical service upgrade gas test needed.
How many permits and filings does 508 E 49th St have?
3 filings across 3 projects, from June 18, 2025 to October 30, 2025.
Is there other construction near 508 E 49th St?
Yes. Nearby filings include 507 E 49th St (repair- installation of 3 perimeter piers for foundation slab repair, May 21, 2026); 600 E 49th St (interior remodel - convert to upstairs/downstairs duplex by closing off a single cased opening and remodeling upstairs bar area. no increase in bedrooms bathrooms or square footage, Nov 3, 2026); 507 E 50th St (request to disconnect. updating grounding installing a new meter base and riser and installing a new 125 amp main disconnect, Mar 18, 2025).
How do I get alerts for new permits at 508 E 49th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 507 E 49th StMay 21, 2026Repair- installation of 3 perimeter piers for foundation slab repair · 48 m away
- 600 E 49th StNov 3, 2026Interior remodel - convert to upstairs/downstairs duplex by closing off a single cased opening and remodeling upstairs bar area. no increase in bedrooms bathrooms or square footage · 67 m away
- 507 E 50th StMar 18, 2025Request to disconnect. updating grounding installing a new meter base and riser and installing a new 125 amp main disconnect · 79 m away
- 513 E 49th StMay 22, 2025Replacement of an existing water heater · 80 m away
- 603 E 49th StJul 7, 2026Temporary power panel ref: 2025 091605 bp · 90 m away
- 4911 Duval StJun 30, 2025Total demolition of a 480 sq ft garage/apartment circa 1951 · 97 m away
- 604 E 49th StSep 3, 2026This permit will cover: bathroom circuits living room receptacles bathroom circuits recently purchased older residence; existing bathroom has no receptacle outlets. bathroom walls have original tile the homeowner wants to preserve. receptacles will be surface mounted inside the cabinets flanking the sink to avoid cutting into the tile meeting the 3 ft basin-proximity requirement. adds 2 new 20a 120v gfci breaker-protected circuits for bathroom receptacles run through a 1 emt raceway from the exterior main panel to an accessible attic j-box allowing easier future circuit additions. this raceway also carries the living room circuit below. installation: install 1 raceway from panel to a centrally located 8x8x6 j-box in accessible attic space. from there pipe to a 4-square j-box above the bathroom then into the upper cabinets on either side of the sink. install surface-mount quad receptacles with industrial covers inside the cabinets. living room receptacles adds a 20a 120v afci-protected circuit for in-wall receptacles in the living room located behind a future bookshelf. shares the 1 emt raceway from panel to the 8x8x6 j-box branching separately from that point. installation: from the 8x8x6 j-box pipe to a new 4-square box above the bookshelf location then down to the receptacle locations. wire size: all three circuits supplied with #10 thwn-2 sized for high attic temperatures and conductor-count adjustments. all raceways installed per code; terminations torqued per manufacturer specifications · 97 m away
- 501 E 50th StJul 2, 2025Install irrigation system · 105 m away
- 4902 Duval StOct 27, 2025Replacement of complete existing central heat and air system with or without duct work replacement of a/c system through austin energys weatherization assistance program · 110 m away
- 606 E 49th StAug 20, 2026Replacement of complete existing central heat and air system with or without duct work mcarton · 113 m away
- 602 Fairfield LnJul 10, 2024Amnesty co · 116 m away
- 5009 Evans AveFeb 11, 2026Total demolition of sfr 1177 sq ft circa 1942 · 120 m away