601 E 48th St
Austin, TX 78751
601 E 48th St: 1 project on record
City of Austin lists 1 filing across 1 project at 601 E 48th St, Austin, TX 78751. The most recent, filed December 20, 2023, covers: “Upgrade tank wh with a tankless wh”.
Compiled from City of Austin records · updated Dec 20, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 20, 2023
- since Dec 20, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectUpgrade tank wh with a tankless wh
Upgrade tank wh with a tankless wh
City of Austin permitPlumbing PermitFinal- Record
- 2023-159656 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 601 E 48th St
What is being built at 601 E 48th St?
The latest filing (City of Austin permit 2023-159656 PP, December 20, 2023) covers upgrade tank wh with a tankless wh.
How many permits and filings does 601 E 48th St have?
1 filing across 1 project, from December 20, 2023 to December 20, 2023.
Is there other construction near 601 E 48th St?
Yes. Nearby filings include 605 E 48th St (***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm, Jun 12, 2025); 4708 Evans Ave (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Jul 28, 2026); 4706 Evans Ave (replace approximately 35ft-40ft of sewer line. the existing sewer line has multiple issues such as bellys and separation, Mar 5, 2025).
How do I get alerts for new permits at 601 E 48th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 605 E 48th StJun 12, 2025***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm · 42 m away
- 4708 Evans AveJul 28, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 45 m away
- 4706 Evans AveMar 5, 2025Replace approximately 35ft-40ft of sewer line. the existing sewer line has multiple issues such as bellys and separation · 46 m away
- 4714 Evans AveDec 23, 2024Installing a new gas line to a generator · 63 m away
- 602 E 47th StMar 17, 2026Repairing sewer line on front yard · 72 m away
- 606 E 48th StMar 5, 2024New landscape irrigation system · 79 m away
- 608 E 48th StMay 13, 2024Replacement of complete existing central heat and air system without duct work · 95 m away
- 603 Fairfield LnAug 17, 2026Base: installing a backup battery system and additional meter socket · 95 m away
- 4711 Duval StSep 12, 2024Replace sewer yard line from house connection to city tap · 95 m away
- 4709 Duval StSep 12, 2024Replace sewer yard line from house connection to city tap · 99 m away
- 4707 Duval StSep 12, 2024Replace sewer yard line from house connection to city tap · 100 m away
- 4703 Duval StFeb 24, 2026Replacement of an existing water heater · 103 m away