605 E 48th St
Austin, TX 78751
605 E 48th St: 1 project on record
City of Austin lists 1 filing across 1 project at 605 E 48th St, Austin, TX 78751. The most recent, filed June 12, 2025, covers: “***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm”.
Compiled from City of Austin records · updated Jun 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2025
- since Jun 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm
***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm
City of Austin permitElectrical PermitFinal- Record
- 2025-071879 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 605 E 48th St
What is being built at 605 E 48th St?
The latest filing (City of Austin permit 2025-071879 EP, June 12, 2025) covers ***storm related-hyatt*** emergency repair of permanent overhead meter loop. pole fell during storm.
How many permits and filings does 605 E 48th St have?
1 filing across 1 project, from June 12, 2025 to June 12, 2025.
Is there other construction near 605 E 48th St?
Yes. Nearby filings include 601 E 48th St (upgrade tank wh with a tankless wh, Dec 20, 2023); 606 E 48th St (new landscape irrigation system, Mar 5, 2024); 608 E 48th St (replacement of complete existing central heat and air system without duct work, May 13, 2024).
How do I get alerts for new permits at 605 E 48th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 601 E 48th StDec 20, 2023Upgrade tank wh with a tankless wh · 42 m away
- 606 E 48th StMar 5, 2024New landscape irrigation system · 49 m away
- 608 E 48th StMay 13, 2024Replacement of complete existing central heat and air system without duct work · 60 m away
- 602 E 47th StMar 17, 2026Repairing sewer line on front yard · 66 m away
- 4706 Evans AveMar 5, 2025Replace approximately 35ft-40ft of sewer line. the existing sewer line has multiple issues such as bellys and separation · 87 m away
- 4708 Evans AveJul 28, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 87 m away
- 603 Fairfield LnAug 17, 2026Base: installing a backup battery system and additional meter socket · 93 m away
- 4714 Evans AveDec 23, 2024Installing a new gas line to a generator · 96 m away
- 605 E 47th StJun 3, 2026Interior remodel - replace bath valves change light fixtures update electrical install lvl beam · 108 m away
- 607 E 47th StSep 11, 2024New irrigation · 111 m away
- 513 E 47th StMar 24, 2026Interior remodel of sfr · 116 m away
- 609 E 47th StOct 22, 2024Express: window replacement (five windows like for like) · 118 m away