800 E 45th Half St
Austin, TX 78751
800 E 45th Half St: 1 project on record
City of Austin lists 1 filing across 1 project at 800 E 45th Half St, Austin, TX 78751. The most recent, filed April 16, 2026, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Apr 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 16, 2026
- since Apr 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-045402 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 800 E 45th Half St
What is being built at 800 E 45th Half St?
The latest filing (City of Austin permit 2026-045402 EP, April 16, 2026) covers install level 2 ev charger.
How many permits and filings does 800 E 45th Half St have?
1 filing across 1 project, from April 16, 2026 to April 16, 2026.
Is there other construction near 800 E 45th Half St?
Yes. Nearby filings include 810 E 45th Half St (total demolition of detached structure 710 sq ft circa 1937, Aug 1, 2025); 4510 Caswell Ave (install irrigation system, Sep 9, 2025); 812 E 45th Half St (detached garage with accessory structure on second floor [1bath], Sep 21, 2026).
How do I get alerts for new permits at 800 E 45th Half St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 810 E 45th Half StAug 1, 2025Total demolition of detached structure 710 sq ft circa 1937 · 55 m away
- 4510 Caswell AveSep 9, 2025Install irrigation system · 65 m away
- 812 E 45th Half StSep 21, 2026Detached garage with accessory structure on second floor [1bath] · 68 m away
- 711 E 45th Half StSep 9, 2025Install irrigation system ref: 2025-019435 bp · 76 m away
- 809 E 45th Half StNov 4, 2026Comprehensive interior remodel of existing single family residence. reconfigure interior layout of 1st floor. convert attic into a habitable floor to consist of a bedroom bathroom closet and flex room. relocate residence within boundaries of property. new foundation window restoration and mep. work will result in a 4 bedroom 3.5 bathroom single family residence · 76 m away
- 709 E 46th StApr 28, 2025Tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain line. total length of tunnel is 30 feet total with 2 access holes. 13 feet of sewer line will be replaced to give proper fall outside. water line will be replaced from the meter to the home total length of yard water line is 40 feet · 82 m away
- 4600 Caswell AveMar 10, 2009Cedar crest (aka ridgetop annex, resub of block 1) [orig. filed as porter acres] — cedar crest (aka ridgetop annex, resub of block 1) [orig. filed as porter acres] · 90 m away
- 704 E 45th Half StJan 28, 2026Replacement of complete existing central heat and air system with or without duct work richard maier - replacing like for like 2t vert gas · 106 m away
- 4605 Caswell AveJul 18, 2025Relocation of sfr 1004 sq ft circa 1939 outside of the city · 113 m away
- 4520 Red River StJul 23, 2025Excavate 62 trench to repair main drain line in yard · 119 m away
- 702 E 45th Half StNov 13, 2026Replacing sewer yard line · 121 m away
- 704 E 46th StSep 24, 2026Addressing active code violation for the addition of an unpermitted 8 fence · 122 m away