4600 Caswell Ave
Austin, TX 78751
4600 Caswell Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 4600 Caswell Ave, Austin, TX 78751. The most recent, filed March 10, 2009, covers: “Cedar crest (aka ridgetop annex, resub of block 1) [orig. filed as porter acres]”.
Compiled from City of Austin records · updated Mar 10, 2009
- Projects
- 1
- 1 filings
- Latest filing
- Mar 10, 2009
- since Mar 10, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 4600 Caswell Ave
What is being built at 4600 Caswell Ave?
The latest filing (City of Austin case 178389, March 10, 2009) covers cedar crest (aka ridgetop annex, resub of block 1) [orig. filed as porter acres].
How many permits and filings does 4600 Caswell Ave have?
1 filing across 1 project, from March 10, 2009 to March 10, 2009.
Is there other construction near 4600 Caswell Ave?
Yes. Nearby filings include 706 E 46th St (install irrigation system, Jul 1, 2026); 704 E 46th St (addressing active code violation for the addition of an unpermitted 8 fence, Sep 24, 2026); 709 E 46th St (tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain line. total length of tunnel is 30 feet total with 2 access holes. 13 feet of sewer line will be replaced to give proper fall outside. water line will be replaced from the meter to the home total length of yard water line is 40 feet, Apr 28, 2025).
How do I get alerts for new permits at 4600 Caswell Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 706 E 46th StJul 1, 2026Install irrigation system · 43 m away
- 704 E 46th StSep 24, 2026Addressing active code violation for the addition of an unpermitted 8 fence · 49 m away
- 709 E 46th StApr 28, 2025Tunnel under foundation to replace cast iron for 2 full bathrooms kitchen and washer drain line. total length of tunnel is 30 feet total with 2 access holes. 13 feet of sewer line will be replaced to give proper fall outside. water line will be replaced from the meter to the home total length of yard water line is 40 feet · 52 m away
- 4605 Caswell AveJul 18, 2025Relocation of sfr 1004 sq ft circa 1939 outside of the city · 58 m away
- 4608 Caswell AveNov 21, 2024Change out water heater to existing residence · 64 m away
- 4607 Caswell AveFeb 11, 2009Ridgetop annex, resubdivision of part c of the resubdivision of parts c & d of — ridgetop annex, resubdivision of part c of the resubdivision of parts c and d of lot 1, block 12 · 69 m away
- 4609 Caswell AveOct 1, 2025Install ev charger----install a 60-amp 240v circuit in the 150-amp meter/main combo panel where space is available. hardwire the customer provided charger on the exterior garage wall to the left of the garage door · 80 m away
- 700 E 46th StOct 2, 2025Total demolition of 500 sq ft pool circa 2022 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 83 m away
- 703 E 46th StAug 28, 2024Install new 6.375kw rooftop solar system and 11.5kw energy storage system for existing residential only · 88 m away
- 800 E 45th Half StApr 16, 2026Install level 2 ev charger · 90 m away
- 4615 Caswell AveMar 14, 2025Express: foundation repair · 98 m away
- 4605 Eilers AveJun 26, 2026Express: replace 1 window (like for like) · 100 m away