groundranger
Recent · latest filing Oct 2025Residential

4609 Caswell Ave

Austin, TX 78751

EV charger installation permitted at 4609 Caswell Ave

An EV charger installation at 4609 Caswell Ave includes a 60-amp, 240-volt circuit and a hardwired charger on the exterior garage wall. The City of Austin electrical permit was filed October 1, 2025, and is marked final.

Summarized from City of Austin records · updated Oct 1, 2025

Projects
1
1 filings
Latest filing
Oct 1, 2025
since Oct 1, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install ev charger----install a 60-amp 240v circuit in the 150-amp meter/main combo panel where space is available. hardwire the customer provided charger on the exterior garage wall to the left of the garage door

  1. AppliedSep 16, 2025
  2. IssuedOct 1, 2025
  3. WorkOct '25 – Oct '25
  4. Final inspectionOct 17, 2025

Passed final inspection Oct 17, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install ev charger----install a 60-amp 240v circuit in the 150-amp meter/main combo panel where space is available. hardwire the customer provided charger on the exterior garage wall to the left of the garage door

    Install ev charger----install a 60-amp 240v circuit in the 150-amp meter/main combo panel where space is available. hardwire the customer provided charger on the exterior garage wall to the left of the garage door

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4609 Caswell Ave

What work was permitted at 4609 Caswell Ave?

A City of Austin electrical permit covers installing a circuit for an EV charger and hardwiring the charger on the exterior garage wall. The permit was filed October 1, 2025.

Is an EV charger being installed at 4609 Caswell Ave in Austin?

The permit record describes installing a customer-provided EV charger on the exterior garage wall. The permit is marked final.

What kind of electrical circuit is planned for the charger?

The permit describes a 60-amp, 240-volt circuit in the existing 150-amp meter/main panel, where space is available.

When was the EV charger permit filed for 4609 Caswell Ave?

The City of Austin filed electrical permit 2025-117941 EP on October 1, 2025.

What is the status of permit 2025-117941 EP?

The City of Austin permit record lists the electrical permit as final.

Where will the EV charger be mounted at 4609 Caswell Ave?

The permit description places the hardwired charger on the exterior garage wall to the left of the garage door.

Also being built nearby

All of 78751
Email me when a new permit is filed