905 E 55th Half St
Austin, TX 78751
Home remodel and repairs at 905 E 55th Half St
Austin permits filed in 2025 cover an interior remodel, structural repairs, and updates to the home’s siding, bathrooms, kitchen, electrical, and plumbing systems. A separate permit filed April 10, 2026, describes replacing sewer piping; that permit is listed as expired.
Summarized from City of Austin records · updated Apr 10, 2026
- Projects
- 7
- 7 filings
- Latest filing
- Apr 10, 2026
- since Apr 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsExterior access and expose main 4 inch cast iron stack and remaining buried 4 inch cast iron sewer main and replace with schedule 40 pvc
Exterior access and expose main 4 inch cast iron stack and remaining buried 4 inch cast iron sewer main and replace with schedule 40 pvc
City of Austin permitPlumbing PermitExpired- Record
- 2026-024629 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
City of Austin permitMechanical PermitFinal- Record
- 2025-046518 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel structural repairs after investigation of open sheetrock. reference 2025-046518 bp
Interior remodel structural repairs after investigation of open sheetrock. reference 2025-046518 bp
City of Austin permitBuilding PermitFinal- Record
- 2025-103215 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Setup temp power pole
Setup temp power pole
City of Austin permitElectrical PermitFinal- Record
- 2025-063670 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
City of Austin permitPlumbing PermitFinal- Record
- 2025-046518 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
City of Austin permitElectrical PermitFinal- Record
- 2025-046518 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
Express: replace siding replace drywall replace existing bathroom fixtures replace shower surround in primary bathroom and hallway bathroom replace existing kitchen fixtures remove kitchenette and seal off and secure plumbing in master bedroom electrical work throughout replace electrical subpanel cap gas lines throughout and remove old furnace valves foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-046518 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 905 E 55th Half St
What is being built at 905 E 55th Half St?
The permits describe remodeling and repairs to an existing home, not a new building. Work includes interior and structural repairs and updates to plumbing, electrical, and other systems.
Is there a new restaurant opening at 905 E 55th Half St?
The available permit descriptions do not show a restaurant build-out. They describe residential remodeling and repairs.
What renovation work was permitted at 905 E 55th Half St?
Permit 2025-046518 BP, filed April 22, 2025, describes siding and drywall replacement, bathroom and kitchen fixture work, electrical work, gas line work, and foundation repairs. A separate building permit, 2025-103215 BP, filed August 15, 2025, describes interior remodeling and structural repairs.
Were sewer repairs permitted at 905 E 55th Half St?
Permit 2026-024629 PP, filed April 10, 2026, describes exposing and replacing sewer piping. The permit is listed as expired.
When were permits filed for the work at 905 E 55th Half St?
The earliest listed permit was filed April 22, 2025, and the latest was filed April 10, 2026. Most of the listed remodel permits were filed in 2025.
Is 905 E 55th Half St a new construction project?
The permit descriptions indicate repairs and remodeling at an existing home. They do not describe construction of a new building.
Also being built nearby
All of 78751- 903 E 55th Half StMay 1, 202410 ft sewer repipe under pier and beam home · 16 m away
- 901 E 55th Half StApr 27, 2025Connection new gas line to new furnace. whole home gas test · 34 m away
- 906 E 55th Half StJul 18, 2024Replacement of an existing water heater · 42 m away
- 905 E 56th StMar 4, 2026Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 5516 Helen StMay 7, 2025Roof replacement for multi-family building · 104 m away
- 5518 Helen StMay 28, 2025Roof replacement for multi-family building · 113 m away
- 909 E 55th StJun 20, 2024Cap off with ww · 122 m away
- 901 E 55th StJul 18, 2024Replacement of an existing water heater · 129 m away
- 5602 Bennett AveOct 16, 2025Need a disconnect/reconnect to install our battery backup system · 135 m away
- 900 E 56th StFeb 12, 2026Replace sewer lines under the house and sewer yard line · 139 m away
- 5411 Bennett AveNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 5501 Airport BlvdNov 13, 2025Interior remodel: demolition walls new walls mep electrical casework sheet-rock painting flooring scope includes an on-site generator · 152 m away