5411 Bennett Ave
Austin, TX 78751
5411 Bennett Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 5411 Bennett Ave, Austin, TX 78751. The most recent, filed November 10, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 10, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 10, 2025
- since Nov 10, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-144016 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5411 Bennett Ave
What is being built at 5411 Bennett Ave?
The latest filing (City of Austin permit 2025-144016 MP, November 10, 2025) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 5411 Bennett Ave have?
1 filing across 1 project, from November 10, 2025 to November 10, 2025.
Is there other construction near 5411 Bennett Ave?
Yes. Nearby filings include 5407 Bennett Ave (install level 2 ev charger, Sep 14, 2026); 926 E 54th St (trench in front yard to locate water yard line. trench to carport to relocate water yard line for new filtration system. standalone permit- no remodeling or working with gc, Mar 5, 2024); 909 E 55th St (cap off with ww, Jun 20, 2024).
How do I get alerts for new permits at 5411 Bennett Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5407 Bennett AveSep 14, 2026Install level 2 ev charger · 48 m away
- 926 E 54th StMar 5, 2024Trench in front yard to locate water yard line. trench to carport to relocate water yard line for new filtration system. standalone permit- no remodeling or working with gc · 97 m away
- 909 E 55th StJun 20, 2024Cap off with ww · 112 m away
- 908 E 54th StMay 15, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 934 E 54th StJun 27, 2025Replacement of complete existing central heat and air system with or without duct work hallway through scuttle · 128 m away
- 927 E 54th StJul 21, 2026Service line was taken out by a tree. replacing wire weather head and meter hub · 136 m away
- 905 E 55th Half StApr 10, 2026Exterior access and expose main 4 inch cast iron stack and remaining buried 4 inch cast iron sewer main and replace with schedule 40 pvc · 144 m away
- 929 E 56th StMay 28, 2025200amp service and meter can replacement with overhead and grounding · 154 m away
- 901 E 55th StJul 18, 2024Replacement of an existing water heater · 158 m away
- 903 E 55th Half StMay 1, 202410 ft sewer repipe under pier and beam home · 158 m away
- 906 E 55th Half StJul 18, 2024Replacement of an existing water heater · 161 m away
- 931 E 56th StNov 11, 2024Excavate 30 tunnel to repair drain line serving kitchen · 163 m away