5407 Bennett Ave
Austin, TX 78751
EV charger and heating system work at 5407 Bennett Ave
Austin permits at 5407 Bennett Ave document installation of a Level 2 EV charger and replacement of the existing central heating and air system. The mechanical permit was filed November 3, 2025, and the electrical permit was filed September 14, 2026; both are marked final.
Summarized from City of Austin records · updated Sep 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 14, 2026
- since Nov 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-118768 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-141069 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5407 Bennett Ave
What is being built at 5407 Bennett Ave in Austin?
The permits describe upgrades to an existing property: a Level 2 EV charger and a replacement central heating and air system. They do not identify a new building.
Is a new house being built at 5407 Bennett Ave?
The records provided show permits for mechanical-system replacement and EV charger installation, not new-home construction.
Is an EV charger being installed at 5407 Bennett Ave?
Yes. Austin electrical permit 2026-118768 EP, filed September 14, 2026, describes installation of a Level 2 EV charger and is marked final.
When was the heating and air system permit filed at 5407 Bennett Ave?
Austin mechanical permit 2025-141069 MP was filed November 3, 2025. It covers replacement of the existing central heat and air system, with or without duct work, and is marked final.
Are the permits for 5407 Bennett Ave final?
Both listed permits are marked final: the mechanical permit filed November 3, 2025, and the electrical permit filed September 14, 2026.
Also being built nearby
All of 78751- 5411 Bennett AveNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 926 E 54th StMar 5, 2024Trench in front yard to locate water yard line. trench to carport to relocate water yard line for new filtration system. standalone permit- no remodeling or working with gc · 68 m away
- 934 E 54th StJun 27, 2025Replacement of complete existing central heat and air system with or without duct work hallway through scuttle · 81 m away
- 927 E 54th StJul 21, 2026Service line was taken out by a tree. replacing wire weather head and meter hub · 106 m away
- 908 E 54th StMay 15, 2025Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 5405 Harmon AveNov 14, 2024Rebuild 100 amp single phase overhead service that was destroyed by a tree limb · 133 m away
- 5411 Harmon AveJan 24, 2024Replacement of an existing water heater · 135 m away
- 5403 Harmon AveApr 18, 2025Express: foundation repair · 141 m away
- 909 E 55th StJun 20, 2024Cap off with ww · 144 m away
- 928 E 53rd Half StSep 3, 2026Installation of ev charger · 146 m away
- 930 E 53rd Half StJul 16, 2026Upgrade electrical service to 200a · 147 m away
- 5401 Harmon AveJun 1, 2026Express: like-for-like window replacement siding repair · 147 m away