909 E 50th St
Austin, TX 78751
909 E 50th St: 3 projects on record
City of Austin lists 3 filings across 3 projects at 909 E 50th St, Austin, TX 78751. The most recent, filed May 13, 2026, covers: “Trench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home”.
Compiled from City of Austin records · updated May 13, 2026
- Projects
- 3
- 3 filings
- Latest filing
- May 13, 2026
- since May 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsTrench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home
Trench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home
City of Austin permitPlumbing PermitFinal- Record
- 2026-058933 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel of 1st floor and addition of an office. remove existing siding back and right
Remodel of 1st floor and addition of an office. remove existing siding back and right
City of Austin permitElectrical PermitFinal- Record
- 2022-136347 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel of 1st floor and addition of an office. remove existing siding back and right
Remodel of 1st floor and addition of an office. remove existing siding back and right
City of Austin permitMechanical PermitFinal- Record
- 2022-136347 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 909 E 50th St
What is being built at 909 E 50th St?
The latest filing (City of Austin permit 2026-058933 PP, May 13, 2026) covers trench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home.
How many permits and filings does 909 E 50th St have?
3 filings across 3 projects, from May 13, 2026 to May 13, 2026.
Is there other construction near 909 E 50th St?
Yes. Nearby filings include 915 E 50th St (construct new driveway approach in the alley of 19 ft **no sidewalk inspection per bp, Mar 20, 2025); 5001 Airport Blvd (el dorado meat market, Oct 21, 2008); 5009 Airport Blvd (re-route the sewer line via tunnel, Feb 6, 2024).
How do I get alerts for new permits at 909 E 50th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 915 E 50th StMar 20, 2025Construct new driveway approach in the alley of 19 ft **no sidewalk inspection per bp · 40 m away
- 5001 Airport BlvdOct 21, 2008El dorado meat market · 51 m away
- 5009 Airport BlvdFeb 6, 2024Re-route the sewer line via tunnel · 63 m away
- 5003 Airport BlvdJan 22, 2026Emergency repairs. line side service conductors struck by jackhammer live & exposed conductors before overcurrent protection · 69 m away
- 4917 Airport BlvdNov 30, 2023Replace stolen wires that run from load side of meter to main breaker. replace stolen wires that run from main breaker to the inside panel box · 78 m away
- 4914 Bennett AveMar 23, 2015Tomlinson's office parking site plan · 90 m away
- 905 E 51st StJun 4, 2025Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 911 E 51st StNov 12, 2024Per tx gas- relocate gas meter away from doors windows and crawl space vents · 113 m away
- 5008 Bennett AveApr 12, 2024New irrigation · 121 m away
- 4905 Airport BlvdNov 30, 2025Afs will be changing out the sewer yard line at the tysons tacos. the line is broken in multiple places · 123 m away
- 927 E 50th StApr 22, 2024Addition/remodel. addition to expand footprint of existing noncomplying detached garage and add a loft · 124 m away
- 908 E 51st StNov 13, 2024Interior remodel reconfigure interior walls to have 3 beds and 2 bath on left side of house kitchen living dinging on right side new vaulted ceiling (no changes to roof height) swap out windows and doors new mep · 124 m away