5001 Airport Blvd
Austin, TX 78751
5001 Airport Blvd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5001 Airport Blvd, Austin, TX 78751 since March 2, 2007. The most recent, filed October 21, 2008, covers: “El dorado meat market”.
Compiled from City of Austin records · updated Oct 21, 2008
- Projects
- 2
- 2 filings
- Latest filing
- Oct 21, 2008
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 5001 Airport Blvd
What is being built at 5001 Airport Blvd?
The latest filing (City of Austin case 10073786, October 21, 2008) covers el dorado meat market.
How many permits and filings does 5001 Airport Blvd have?
2 filings across 2 projects, from March 2, 2007 to October 21, 2008.
Is there other construction near 5001 Airport Blvd?
Yes. Nearby filings include 5003 Airport Blvd (emergency repairs. line side service conductors struck by jackhammer live & exposed conductors before overcurrent protection, Jan 22, 2026); 5009 Airport Blvd (re-route the sewer line via tunnel, Feb 6, 2024); 909 E 50th St (trench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home, May 13, 2026).
How do I get alerts for new permits at 5001 Airport Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5003 Airport BlvdJan 22, 2026Emergency repairs. line side service conductors struck by jackhammer live & exposed conductors before overcurrent protection · 19 m away
- 5009 Airport BlvdFeb 6, 2024Re-route the sewer line via tunnel · 27 m away
- 909 E 50th StMay 13, 2026Trench and replace sewer yard line from cleanout to city tap location. replace supply line from meter up to fixtures inside home · 51 m away
- 905 E 51st StJun 4, 2025Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 915 E 50th StMar 20, 2025Construct new driveway approach in the alley of 19 ft **no sidewalk inspection per bp · 76 m away
- 911 E 51st StNov 12, 2024Per tx gas- relocate gas meter away from doors windows and crawl space vents · 87 m away
- 908 E 51st StNov 13, 2024Interior remodel reconfigure interior walls to have 3 beds and 2 bath on left side of house kitchen living dinging on right side new vaulted ceiling (no changes to roof height) swap out windows and doors new mep · 91 m away
- 808 E 51st StMay 28, 2025Secondary mechanical contractor to perform the installation of new walk in freezer for remodel only. reference 2024-140086 bp · 101 m away
- 5005 Caswell AveApr 15, 2025Drainage improvements structural improvements below floor crawl space & ceiling improvements which includes some electrical and mechanical work · 104 m away
- 4917 Airport BlvdNov 30, 2023Replace stolen wires that run from load side of meter to main breaker. replace stolen wires that run from main breaker to the inside panel box · 121 m away
- 919 E 51st StJun 29, 2026Express: foundation repair · 128 m away
- 5008 Bennett AveApr 12, 2024New irrigation · 129 m away