1420 Scheider Dr
Austin, TX 78754
1420 Scheider Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1420 Scheider Dr, Austin, TX 78754. The most recent, filed June 20, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jun 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2024
- since Jun 20, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-073949 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1420 Scheider Dr
What is being built at 1420 Scheider Dr?
The latest filing (City of Austin permit 2024-073949 PP, June 20, 2024) covers replacement of an existing water heater.
How many permits and filings does 1420 Scheider Dr have?
1 filing across 1 project, from June 20, 2024 to June 20, 2024.
Is there other construction near 1420 Scheider Dr?
Yes. Nearby filings include 1406 Scheider Dr (saliangnak - install new 12.045kw rooftop solar system to existing residential only using backfed breaker, Nov 16, 2023); 1400 Scheider Dr (install new solar system on an existing residential rooftop, Jan 8, 2024); 1416 Mussett St (replacement of an existing water heater, Mar 4, 2025).
How do I get alerts for new permits at 1420 Scheider Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 1406 Scheider DrNov 16, 2023Saliangnak - install new 12.045kw rooftop solar system to existing residential only using backfed breaker · 45 m away
- 1400 Scheider DrJan 8, 2024Install new solar system on an existing residential rooftop · 68 m away
- 1416 Mussett StMar 4, 2025Replacement of an existing water heater · 106 m away
- 1400 Brixey CvJan 7, 2026**sewer repair & replacing 20 of sewer line · 121 m away
- 1636 Payton Falls DrMar 16, 2026Replace 50 gallon natural gas water heater · 146 m away
- 1409 Payton Falls DrApr 22, 2025Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 1632 Payton Falls DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 161 m away
- 1500 Braxton Valley CvDec 8, 2023Replacement of an existing water heater · 167 m away
- 1408 Brixey CvJul 22, 2024Install of roof mounted solar panels · 167 m away
- 11303 April DrOct 15, 20256.44kw rooftop solar installation · 192 m away
- 11513 June DrOct 26, 2026Gas test. gas lines inspection · 194 m away
- 1425 Payton Falls DrMay 4, 2026(mccall cary) - installation of circuit for elec. vehicle charging station - esip · 196 m away