1400 Brixey Cv
Austin, TX 78754
Sewer line repair permitted at 1400 Brixey Cv
A sewer repair and partial sewer-line replacement were permitted at 1400 Brixey Cv on January 7, 2026. The City of Austin permit describes the work as replacing part of the sewer line; it does not indicate new building construction.
Summarized from City of Austin records · updated Jan 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 7, 2026
- since Jan 7, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled**sewer repair & replacing 20 of sewer line
- AppliedJan 6, 2026
- IssuedJan 7, 2026
- WorkJan '26 – Jan '26
- Final inspectionJan 14, 2026
Passed final inspection Jan 14, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project**sewer repair & replacing 20 of sewer line
**sewer repair & replacing 20 of sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2026-001143 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1400 Brixey Cv
What is being built at 1400 Brixey Cv in Austin?
The City of Austin record is for sewer repair and partial sewer-line replacement, not a new building. The permit was filed January 7, 2026.
What work is planned at 1400 Brixey Cv?
Permit 2026-001143 PP describes sewer repair and replacing part of the sewer line. The record does not specify the length of line being replaced.
When was the sewer permit filed for 1400 Brixey Cv?
The City of Austin permit was filed on January 7, 2026.
What is the permit number for work at 1400 Brixey Cv?
The permit number is 2026-001143 PP. It is listed as a plumbing permit with final status.
Is a new home being built at 1400 Brixey Cv?
The available City of Austin record indicates sewer repair and partial sewer-line replacement, not new home construction.
How much will the sewer work at 1400 Brixey Cv cost?
The permit record does not list a reported valuation or project cost.
Also being built nearby
All of 78754- 1408 Brixey CvJul 22, 2024Install of roof mounted solar panels · 48 m away
- 1500 Braxton Valley CvDec 8, 2023Replacement of an existing water heater · 81 m away
- 1636 Payton Falls DrMar 16, 2026Replace 50 gallon natural gas water heater · 105 m away
- 1505 Braxton Valley CvMar 6, 2025Replacement of an existing water heater · 107 m away
- 1508 Braxton Valley CvOct 1, 2026Replacement of complete existing central heat and air system with or without duct work install 4 ton 14.3 seer gas system complete · 118 m away
- 1509 Braxton Valley CvJun 5, 2026Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw · 118 m away
- 1420 Scheider DrJun 20, 2024Replacement of an existing water heater · 121 m away
- 1632 Payton Falls DrSep 18, 2026Base: installing a backup battery system and additional meter socket · 124 m away
- 1406 Scheider DrNov 16, 2023Saliangnak - install new 12.045kw rooftop solar system to existing residential only using backfed breaker · 148 m away
- 1400 Scheider DrJan 8, 2024Install new solar system on an existing residential rooftop · 165 m away
- 1413 Vista Ridge CvDec 5, 2023Replacement of complete existing central heat and air system with or without duct work · 177 m away
- 11212 Hidden Bluff DrDec 8, 2023Addition of 720sqft deck to existing 1 story sfr. amnesty co to be included for dwelling · 191 m away