groundranger
Active · latest filing Oct 2026Residential

1508 Braxton Valley Cv

Austin, TX 78754

Central heating and air system replacement in Austin

A permit records replacement of the existing central heating and air system at 1508 Braxton Valley Cv with a 4-ton, 14.3-SEER gas system. The City of Austin permit was filed October 1, 2026, and is listed as final.

Summarized from City of Austin records · updated Oct 1, 2026

Projects
1
1 filings
Latest filing
Oct 1, 2026
since Oct 1, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work install 4 ton 14.3 seer gas system complete

  1. AppliedSep 24, 2026
  2. IssuedOct 1, 2026
  3. WorkOct '26 – Oct '26
  4. Final inspectionOct 27, 2026

Passed final inspection Oct 27, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work install 4 ton 14.3 seer gas system complete

    Replacement of complete existing central heat and air system with or without duct work install 4 ton 14.3 seer gas system complete

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1508 Braxton Valley Cv

What work is happening at 1508 Braxton Valley Cv?

A City of Austin mechanical permit records replacement of the complete existing central heating and air system, with or without ductwork. The permit is 2026-126292 MP.

When was the HVAC permit filed for 1508 Braxton Valley Cv?

The permit was filed October 1, 2026. Its status is listed as final.

What size HVAC system is being installed at 1508 Braxton Valley Cv?

The permit describes a 4-ton, 14.3-SEER gas system.

Is a new house being built at 1508 Braxton Valley Cv?

The available City of Austin record is for a mechanical system replacement, not a new-home construction permit.

What is permit 2026-126292 MP for in Austin?

It records replacement of the existing central heating and air system at 1508 Braxton Valley Cv with a 4-ton, 14.3-SEER gas system. The permit was filed October 1, 2026.

Also being built nearby

All of 78754
Email me when a new permit is filed