groundranger
Recent · latest filing Jun 2026Residential

1509 Braxton Valley Cv

Austin, TX 78754

Level 2 EV charger permitted at 1509 Braxton Valley Cv

A Level 2 electric vehicle charger is being installed at 1509 Braxton Valley Cv in Austin. The City of Austin issued electrical permit 2026-069802 EP on June 5, 2026; the permit is marked final.

Summarized from City of Austin records · updated Jun 5, 2026

Projects
1
1 filings
Latest filing
Jun 5, 2026
since Jun 5, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw

  1. AppliedJun 2, 2026
  2. IssuedJun 5, 2026
  3. WorkJun '26 – Jun '26
  4. Final inspectionJun 12, 2026

Passed final inspection Jun 12, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw

    Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 34 emt conduit to power the level 2 ev charger at 48amp constant draw

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1509 Braxton Valley Cv

What is being installed at 1509 Braxton Valley Cv?

A Level 2 EV charger is being installed, according to City of Austin electrical permit 2026-069802 EP, dated June 5, 2026.

When was the EV charger permit issued?

The City of Austin permit is dated June 5, 2026, and is marked final.

What kind of EV charger is planned at this address?

The permit describes a Level 2 EV charger with a 48-amp constant draw.

What electrical work does the permit describe?

It specifies a 60-amp circuit breaker and less than five feet of new conduit to power the charger.

Is a new building being constructed at 1509 Braxton Valley Cv?

The available record is for an electrical permit to install a Level 2 EV charger; it does not describe construction of a new building.

What is the permit number for the work at 1509 Braxton Valley Cv?

The permit number is 2026-069802 EP. It was filed with the City of Austin on June 5, 2026.

Also being built nearby

All of 78754
Email me when a new permit is filed