What's being built in College Station 77843
24 College Station addresses in 77843 had a building permit or project filing in the past 12 months, out of 25 on record. The most active project types are offices (6), schools & daycares (4), demolitions (4). The latest filing here was November 3, 2026.
- Active in last 12 mo
- 24
- Addresses on record
- 25
- Latest filing
- Nov 3, 2026
By project type
Recent commercial projects
- 206 Olsen Blvd · Texas A&m University SystemsNov 3, 2026Tamu reynolds first floor restrooms renovation — renovation/alteration — renovate existing restrooms on the first floor
- 400 Joe Routt Blvd · Texas A&m University SystemSep 28, 2026Tamu koldus building rm 118 add restroom — renovation/alteration — renovation office and add private restroom
- 611 Ross St · The Texas A&m University SystemSep 11, 2026Tamu halbouty reconfigure classroom 260 — renovation/alteration — remove existing dividing wall and curved screen to create one large classroom space with new finishes, power and data for future desks, and dedicated teaching wall
- 180 Spence Street · Texas A&m University SystemsSep 6, 2026James j. cain room 1, hall 2, refresh hallway — renovation/alteration — first floor corridor with sheetrock over cmu, additional vision kits, new ceilings and flooring
- 1125 Hensel Dr · Texas A&m University SystemsSep 4, 2026Tame becky gates children's center kitchen renovation and grease interceptor — renovation/alteration — the renovation of the existing kitchen and additional auxiliary spaces and design of a new, increased capacity grease interceptor
- 580 Ross StAug 13, 2026Tamu department of chemistry 1986 wing 2nd floor lab renovation (part c) — renovation/alteration — renovation of 2,600 s.f. of floor area on the second floor. renovation will include two laboratories
- 644 Mosher Lane · Texas A&m University SystemsAug 11, 2026Tamu underwood hall shower & fas replacement sm2027 — renovation/alteration — replace existing shower units with solid surface shower enclosure
- 3240 F&b Road · Texas A&m University SystemsJul 20, 2026Tamu equine initiative building remodel — renovation/alteration — renovation of finishes and installation of new lockers, kitchenette and seating
- 201 John Kimbrough Blvd · Texas A&m University SystemsJun 4, 2026Tamu west campus garage pedestrian path — renovation/alteration — expansion of sidewalks, delete stairs and create ramps
- 730 Olsen Blvd · Texas A&m University SystemsMay 12, 2026Reed arena upgrade volleyball locker room and other areas — renovation/alteration — renovation of interior finishes, fixtures and layout
- 544 Ross Street · Texas A&m University SystemsMay 12, 2026Harrington education center, lab 303 renovation — renovation/alteration — interior finishes for the lab 303
- 214 Olsen Blvd · Texas A&m University SystemsMay 11, 2026Tamu west campus library — renovation/alteration — interior renovations for flooring and paint
- 940 Olsen Blvd · Texas A&m University SystemsMay 7, 2026Tamu ellis soccer building. renovation — renovation/alteration — interior renovations and new lockers and kitchenette
- 330 Agronomy Road · Texas A&m University SystemsMay 6, 2026Tamu purchasing & stores interior renovation — renovation/alteration — interior renovations, new flooring, door hardware and painting
- 272 Olsen Blvd · Texas A&m University SyestemsMay 6, 2026Tamu nuclear magnetic resonance door modifications — renovation/alteration — new doors
Latest filings
- 206 Olsen Blvd · Texas A&m University SystemsNov 3, 2026Tamu reynolds first floor restrooms renovation — renovation/alteration — renovate existing restrooms on the first floor
- 400 Joe Routt Blvd · Texas A&m University SystemSep 28, 2026Tamu koldus building rm 118 add restroom — renovation/alteration — renovation office and add private restroom
- 611 Ross St · The Texas A&m University SystemSep 11, 2026Tamu halbouty reconfigure classroom 260 — renovation/alteration — remove existing dividing wall and curved screen to create one large classroom space with new finishes, power and data for future desks, and dedicated teaching wall
- 180 Spence Street · Texas A&m University SystemsSep 6, 2026James j. cain room 1, hall 2, refresh hallway — renovation/alteration — first floor corridor with sheetrock over cmu, additional vision kits, new ceilings and flooring
- 1125 Hensel Dr · Texas A&m University SystemsSep 4, 2026Tame becky gates children's center kitchen renovation and grease interceptor — renovation/alteration — the renovation of the existing kitchen and additional auxiliary spaces and design of a new, increased capacity grease interceptor
- 580 Ross StAug 13, 2026Tamu department of chemistry 1986 wing 2nd floor lab renovation (part c) — renovation/alteration — renovation of 2,600 s.f. of floor area on the second floor. renovation will include two laboratories
- 644 Mosher Lane · Texas A&m University SystemsAug 11, 2026Tamu underwood hall shower & fas replacement sm2027 — renovation/alteration — replace existing shower units with solid surface shower enclosure
- 3240 F&b Road · Texas A&m University SystemsJul 20, 2026Tamu equine initiative building remodel — renovation/alteration — renovation of finishes and installation of new lockers, kitchenette and seating
- 201 John Kimbrough Blvd · Texas A&m University SystemsJun 4, 2026Tamu west campus garage pedestrian path — renovation/alteration — expansion of sidewalks, delete stairs and create ramps
- 730 Olsen Blvd · Texas A&m University SystemsMay 12, 2026Reed arena upgrade volleyball locker room and other areas — renovation/alteration — renovation of interior finishes, fixtures and layout
- 544 Ross Street · Texas A&m University SystemsMay 12, 2026Harrington education center, lab 303 renovation — renovation/alteration — interior finishes for the lab 303
- 214 Olsen Blvd · Texas A&m University SystemsMay 11, 2026Tamu west campus library — renovation/alteration — interior renovations for flooring and paint
- 940 Olsen Blvd · Texas A&m University SystemsMay 7, 2026Tamu ellis soccer building. renovation — renovation/alteration — interior renovations and new lockers and kitchenette
- 330 Agronomy Road · Texas A&m University SystemsMay 6, 2026Tamu purchasing & stores interior renovation — renovation/alteration — interior renovations, new flooring, door hardware and painting
- 272 Olsen Blvd · Texas A&m University SyestemsMay 6, 2026Tamu nuclear magnetic resonance door modifications — renovation/alteration — new doors
- 710 Ross Street · Texas A&m University SystemsApr 22, 2026Tamu bright building refresh floors 4 & 6 — renovation/alteration — replace carpet, vct and cove base replace rr counter tops and sinks painting walls
- 788 Ross Street · Texas A&m University SystemsApr 22, 2026Tamu langford arch building. c fy26 cic classroom renovations — renovation/alteration — refreshing 8 classrooms-carpet painting lighting and furniture
- 365 Houston St · The Texas A&m University SystemMar 26, 2026Tamu ymca suite 108 renovation — renovation/alteration — renovation of an existing suite to create additional offices and storage space
- 495 Horticulture Road · The Texas A&m University SystemMar 26, 2026Horticulture forest science design growth chambers 119 & 120 — renovation/alteration — renovation of an existing open area to provide a new wall to create a room in which new growth chambers will be housed for research
- 306 University Drive · Texas A&m UniversityMar 25, 2026Tamu hullabaloo room 106 modifications — renovation/alteration — renovation of an existing office suite
- 245 Spence Street · Texas A&m University SystemMar 5, 2026Renovation of floor 10 lab suite 1001 tamu richardson petroleum — renovation/alteration — interior finishes on the 10th floor for classrooms and labs
- 910 Olsen Blvd · Texas A&m University SystemJan 28, 2026Tamu athletics soccer training room renovation — renovation/alteration — interior renovations
- 4113 Tamu, 210 Olsen Blvd · Texas A&m System Facilities Planning & ConstructionJan 13, 2026Wehner trading floor — renovation/alteration — interior remodel: replacement of interior window/door systems, electrical floor boxes, av project/screens, interior finishes
- 233 John David Crow Drive · Texas A&m University SystemsDec 19, 2025Head football coach renovation — renovation/alteration — renovation of an existing facility
- 456 Ross Street · Texas A&m University SystemsNov 1, 2025Bolton hall renovation — renovation/alteration — interior renovations
- 466 Nagle Street Tamu Campus · Texas A&m University SystemsOct 10, 2025Tamu heldenfels hall 4th floor — renovation/alteration — renovation the 4th floor
- 949 Olsen Blvd · The Texas A&m University SystemAug 19, 2025Player development center at blue bell park — new construction — the scope of work includes the demolition of the existing batting cage facility and new construction of the player development center. this will include locker rooms, hitting cages, and accessory development areas
- 101 Bizzell St · Texas A&m University SystemsAug 11, 2025Tamu etb 5th floor office reno — renovation/alteration — room subdivided into four new office spaces. hvac, power lighting and fire alarm included
- 483 Agronomy Road · Texas A&m University SystemJul 10, 2025Larr room 210 sterilizer — renovation/alteration — install new sterilizer equipment
- 500 Gene Stallings Bi · Texas A&m University Transportation ServicesApr 25, 2025Stallings boulevard garage exit modifications — renovation/alteration — structural, electrical and technology modifications to the parking garage. new pedestrian entrance/exit. pedestrian path modifications exterior of the garage
Questions about 77843
What is being built in 77843?
24 College Station addresses in 77843 had a building permit or project filing in the past 12 months, out of 25 on record. The most active project types are offices (6), schools & daycares (4), demolitions (4). The latest filing here was November 3, 2026.
What new commercial projects are in College Station 77843?
Recent commercial filings include 206 Olsen Blvd, 400 Joe Routt Blvd, 611 Ross St.