456 Ross Street
College Station, TX 77843 · Texas A&m University Systems
Interior renovation registered for Bolton Hall
A 30,000-square-foot interior renovation is planned for Bolton Hall at TAMU in College Station. The project was registered with the Texas Department of Licensing and Regulation on November 1, 2025, and its status is listed as inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 1, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 1, 2025
- since Nov 1, 2025
- Largest scope
- 30,000 sf
- Estimated cost
- $12M
- state registration
Where this project stands
Inspected · closing outBolton Hall Renovation
30,000 sq ft · $12M est.
- RegisteredNov 1, 2025
- Plan review
- ConstructionJul '25 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovations — tamu bolton hall
TDLR project registrationRenovation/AlterationInspection Complete30,000 sq ft$12M est.- Project #
- TABS2026004836
- Tenant / owner
- Bolton Hall Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 456 Ross Street
What is being built at 456 Ross Street in College Station?
The TDLR registration describes interior renovations to Bolton Hall, covering 30,000 square feet. The project is a renovation, not a new building.
When was the Bolton Hall renovation registered?
The project was registered on November 1, 2025, under TDLR number TABS2026004836.
How much will the Bolton Hall renovation cost?
The TDLR registration lists an estimated project cost of $12 million. This is the applicant’s estimate.
Is the Bolton Hall renovation complete?
The TDLR record lists the project status as inspection complete. It does not provide a completion date.
What's being renovated near Honcho Temp Leasing Office on University Drive?
A 30,000-square-foot interior renovation is registered for Bolton Hall at TAMU, about 328 meters from the Honcho Temp Leasing Office listed at 409 University Drive.
Is a new building going up near Aki Sushi in College Station?
The listed project is an interior renovation of Bolton Hall, not a new building. Aki Sushi is about 344 meters away, according to the project data.
Also being built nearby
All of 77843- 409 University Dr · 409 University LLCApr 22, 2026Honcho temp leasing office — renovation/alteration — interior finish out 2000 sq ft · 328 m away
- 509 University Drive · Cooley Properties LLCJan 8, 2026Aki sushi — renovation/alteration — remodel existing parking lot · 344 m away
- 319 University Drive · Mbds Properties, LLCSep 30, 2025Ever temporary leasing office — renovation/alteration — renovation of an existing 2,213 square foot office space into temporary leasing office for ever student housing facility · 371 m away
- 308 University Drive · Tamu Schuhmacher Residence Hall Bldg 0430Mar 21, 2024Schuhmacher residence hall plumbing pilot — renovation/alteration — renovate dorm room bathroom · 377 m away
- 615 Universtity DrAug 14, 2024Rei (284 college station) — new construction — installation of merchandizing fixtures into an existing building · 380 m away
- 306 University Drive · Texas A&m UniversityMar 25, 2026Tamu hullabaloo room 106 modifications — renovation/alteration — renovation of an existing office suite · 384 m away
- 200 College Main Street · A&m United Methodist ChurchFeb 27, 2024A&m united methodist church christian life center renovation — renovation/alteration — replacement of interior finishes and adjustment of some walls · 397 m away
- 203 College Main St · Baptist General Convention Of TexasAug 27, 2026Aggie bsm ahu replacement — renovation/alteration — replace the existing air handler units with new mechanical units and construct a new mechanical closet to enclose and accommodate the equipment · 400 m away
- 214 University Drive Tamu Campus · Texas A&m University SystemsDec 18, 2025Keathley hall plumbing & shower replacement sm2026 — renovation/alteration — plumbing upgrades and bathroom for 63 dorm rooms · 428 m away
- 214 University Drive · Texas A&m University SystemsAug 1, 2024Tamu keathley bathroom and plumbing upgrades — renovation/alteration — bathroom finishes and plumbing upgrades · 428 m away
- 711 University Drive · Dinerstein CompaniesMay 24, 2024Aspire pool level renovation — renovation/alteration — scope of work is limited to level 06 exterior pool deck areas renovation. existing deck paver system and waterproofing are to be fully removed and replaced with new roof pavers on elevated pedestal system with new hot applied waterproofing · 455 m away
- 201 Boyett St · Parallel, CoJan 16, 2025201 boyett street apartments — new construction — 23-story student housing building with ground level lobby / leasing, 9-levels of parking (including one below grade), 14-levels or residential units, and amenity / pool deck on level 23 · 458 m away