3019 Sharpview Ln
Dallas, TX 75228
3019 Sharpview Ln: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 3019 Sharpview Ln, Dallas, TX 75228. The most recent, filed April 22, 2026, covers: “Remove and replace synthetic felt, ice and water shield, drip edge and shingles.shingles will be iko cambridge in dual black”.
Compiled from City of Dallas records · updated Apr 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 22, 2026
- since Apr 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsRemove and replace synthetic felt, ice and water shield, drip edge and shingles.shingles will be iko cambridge in dual black
Remove and replace synthetic felt, ice and water shield, drip edge and shingles.shingles will be iko cambridge in dual black
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 3019 Sharpview Ln
What is being built at 3019 Sharpview Ln?
The latest filing (City of Dallas permit RES-ROOF-26-000590, April 22, 2026) covers remove and replace synthetic felt, ice and water shield, drip edge and shingles.shingles will be iko cambridge in dual black.
How many permits and filings does 3019 Sharpview Ln have?
2 filings across 2 projects, from April 22, 2026 to April 22, 2026.
Is there other construction near 3019 Sharpview Ln?
Yes. Nearby filings include 3029 Sharpview Ln (re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well, Aug 26, 2025); 3030 Sharpview Ln (add a drive approach according to cty standards, Oct 21, 2025); 5811 Clendenin Ave (reroof shingles only certainteed landmark, Aug 12, 2026).
How do I get alerts for new permits at 3019 Sharpview Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 3029 Sharpview LnAug 26, 2025Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 21 m away
- 3030 Sharpview LnOct 21, 2025Add a drive approach according to cty standards · 23 m away
- 5811 Clendenin AveAug 12, 2026Reroof shingles only certainteed landmark · 25 m away
- 5812 Clendenin AveJun 4, 202550 gallon gas water heater · 33 m away
- 5815 Clendenin AveMay 29, 2026Roof replacement shingles only · 35 m away
- 5822 Clendenin AveMay 6, 2025In order to get service to your house, we will need to upgrade the service main will need to run a new rigid conduit through the roof and install new weather head also run new wire inside condo going into new meter base for the cities to connect to meter. i will need to connect to a disconnect. i would also have to run two sticks of ground and also bond to the gas line for to be grounding will also be needing to get a permit from the city in order to do this work · 56 m away
- 5826 Clendenin AveMay 27, 2025Meter repair · 66 m away
- 5831 Clendenin AveFeb 3, 2026Replace double check · 75 m away
- 5830 Clendenin AveMar 12, 2026Replacing one 50 gal water heater · 76 m away
- 5841 Clendenin AveAug 25, 2026Replace approximately 65 feet of gas line and pressure test upon completion · 100 m away
- 5836 N Jim Miller RdOct 15, 2026Relay gas service · 120 m away
- 5839 Chapelwood WayOct 29, 2025Gas test and cap off 2 gas lines · 153 m away