5830 Clendenin Ave
Dallas, TX 75228
Permits cover water heater and HVAC replacements on Clendenin Ave
Dallas permits indicate a replacement 3.5-ton system and a 50-gallon water heater at 5830 Clendenin Ave. The mechanical permit was filed March 10, 2026, and the plumbing permit followed on March 12, 2026.
Summarized from City of Dallas records · updated Mar 12, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 12, 2026
- since Mar 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 5830 Clendenin Ave
What work is permitted at 5830 Clendenin Ave, Dallas?
Dallas permits cover replacing a 3.5-ton system and one 50-gallon water heater.
Is a new home being built at 5830 Clendenin Ave?
The records list residential mechanical and plumbing permits for equipment replacements, not new home construction.
When were the permits filed for 5830 Clendenin Ave?
The mechanical permit was filed March 10, 2026, and the plumbing permit was filed March 12, 2026.
What does permit RES-MEC-26-001007 cover?
The City of Dallas mechanical permit, filed March 10, 2026, covers replacing one 3.5-ton system.
What does permit RES-PLM-26-002725 cover?
The City of Dallas plumbing permit, filed March 12, 2026, covers replacing one 50-gallon water heater.
Also being built nearby
All of 75228- 5826 Clendenin AveMay 27, 2025Meter repair · 10 m away
- 5831 Clendenin AveFeb 3, 2026Replace double check · 13 m away
- 5822 Clendenin AveMay 6, 2025In order to get service to your house, we will need to upgrade the service main will need to run a new rigid conduit through the roof and install new weather head also run new wire inside condo going into new meter base for the cities to connect to meter. i will need to connect to a disconnect. i would also have to run two sticks of ground and also bond to the gas line for to be grounding will also be needing to get a permit from the city in order to do this work · 20 m away
- 5821 Clendenin AveJan 6, 2021Install water heater · 28 m away
- 5841 Clendenin AveAug 25, 2026Replace approximately 65 feet of gas line and pressure test upon completion · 28 m away
- 5815 Clendenin AveMay 29, 2026Roof replacement shingles only · 42 m away
- 5812 Clendenin AveJun 4, 202550 gallon gas water heater · 45 m away
- 5811 Clendenin AveAug 12, 2026Reroof shingles only certainteed landmark · 51 m away
- 3029 Sharpview LnAug 26, 2025Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well · 74 m away
- 3019 Sharpview LnApr 22, 2026Remove and replace synthetic felt, ice and water shield, drip edge and shingles.shingles will be iko cambridge in dual black · 76 m away
- 3030 Sharpview LnOct 21, 2025Add a drive approach according to cty standards · 86 m away
- 5836 N Jim Miller RdOct 15, 2026Relay gas service · 98 m away