205 West Second
Elgin, TX 78621 · Elgin ISD
Elgin ISD at 205 West Second
Texas Department of Licensing and Regulation lists 1 filing across 1 project at 205 West Second, Elgin, TX 78621. The most recent, filed June 11, 2024 for Elgin ISD, covers: “Elgin isd | 205 west road renovation — elgin isd | 205 west road renovation”. The largest filed scope covers 8,882 sq ft. The state accessibility registration estimates the project at $1.7M.
Compiled from Texas Department of Licensing and Regulation records · updated Jun 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2024
- since Jun 11, 2024
- Largest scope
- 8,882 sf
- Estimated cost
- $1.7M
- state registration
Permit & project history
1 projectElgin isd | 205 west road renovation — elgin isd | 205 west road renovation
TDLR project registrationRenovation/AlterationProject Closed8,882 sq ft$1.7M est.- Project #
- TABS2024020549
- Tenant / owner
- Elgin ISD | 205 West Road Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 205 West Second
What is being built at 205 West Second?
The latest filing (TDLR project registration TABS2024020549, June 11, 2024) covers elgin isd | 205 west road renovation — elgin isd | 205 west road renovation.
How many permits and filings does 205 West Second have?
1 filing across 1 project, from June 11, 2024 to June 11, 2024.
How much is the construction at 205 West Second worth?
The project's state registration lists an estimated cost of $1.7M.
What is being built near First Presbyterian Church Of Elgin in Elgin?
205 West Second is about 170 m from First Presbyterian Church Of Elgin (111 Lexington Road). Its latest filing is for elgin isd | 205 west road renovation — elgin isd | 205 west road renovation.
Is there other construction near 205 West Second?
Yes. Nearby filings include 111 Lexington Road (elgin community cupboard and energency housing — new construction — ground-up two-story food pantry and temporary housing facility, Aug 26, 2024); 202 Depot St (elgin police department sidewalk — new construction — approximately 500 sq ft of concrete sidewalk and ramps, concrete planters, handrail, curb and gutter, valley gutter, asphalt paving, and associated signs and striping, Jan 26, 2024); 116 Depot Street (dental office - dr cutbirth — renovation/alteration — interior remodel, Sep 3, 2024).
How do I get alerts for new permits at 205 West Second?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78621- 111 Lexington Road · First Presbyterian Church Of ElginAug 26, 2024Elgin community cupboard and energency housing — new construction — ground-up two-story food pantry and temporary housing facility · 170 m away
- 202 Depot St · City Of ElginJan 26, 2024Elgin police department sidewalk — new construction — approximately 500 sq ft of concrete sidewalk and ramps, concrete planters, handrail, curb and gutter, valley gutter, asphalt paving, and associated signs and striping · 207 m away
- 116 Depot Street · Steven Cutbirth LLCSep 3, 2024Dental office - dr cutbirth — renovation/alteration — interior remodel · 226 m away
- 511 N. Main Street · Maredia Business Inc.Nov 4, 2026Mainstop grocery — additions to existing building — remodel interior & exterior of existing building and construct addition · 234 m away
- 209 Central Ave · Tropical SnoJul 7, 2025Elgin snow cones — new construction — new ground-up construction of a restroom (8'x8') and a storage unit (10'x14'), and a 14'x4' (7 ft high) metal canopy over outdoor ice merchandisers. project will also include a snow cone stand (mobile trailer), picnic tables, sidewalks, & associated · 301 m away
- 601 W. 2nd St · The Katy Elgin, LPMay 14, 2024The katy at elgin — new construction — a 1-story tall amenity center, totaling 6,066 sq ft, located on the ground floor of a 4-story tall multifamily building · 492 m away
- 809 N. Main St · Sudarshan LLCSep 30, 2024809 n. main st. — additions to existing building — adding new uni-sex ada compliant restroom, removing existing screened enclosure and replacing with conditioned building, adding a new conditioned space, and adding an ada curb ramp. total sq ft of work is approx. 713 · 523 m away