601 W. 2nd St
Elgin, TX 78621 · The Katy Elgin, LP
The Katy at Elgin amenity center registered in May 2024
The Katy at Elgin is planned to include a 6,066-square-foot amenity center on the ground floor of a four-story multifamily building at 601 W. 2nd St. The TDLR project registration was filed May 14, 2024, and describes new construction. The applicant estimated the project cost at $700,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2024
- since May 14, 2024
- Largest scope
- 6,066 sf
- Estimated cost
- $700K
- state registration
Permit & project history
1 projectA 1-story tall amenity center, totaling 6,066 sq ft, located on the ground floor of a 4-story tall multifamily building. — amenity center
TDLR project registrationNew ConstructionReview Complete6,066 sq ft$700K est.- Project #
- TABS2024018532
- Tenant / owner
- The Katy At Elgin
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 601 W. 2nd St
What is being built at 601 W. 2nd St. in Elgin?
A TDLR registration describes a 6,066-square-foot amenity center on the ground floor of a four-story multifamily building. The project is named The Katy at Elgin.
What is The Katy at Elgin?
The Katy at Elgin is a multifamily building project with a planned ground-floor amenity center. The registration describes the center as one story tall and 6,066 square feet.
When was The Katy at Elgin project filed?
The TDLR project registration, TABS2024018532, was filed May 14, 2024. Its status is listed as Review Complete.
How much will The Katy at Elgin cost?
The applicant's estimated cost for the project is $700,000. This is an estimate, not a confirmed final cost.
What is being built near Elgin Elementary School?
The Katy at Elgin project at 601 W. 2nd St. includes a registered 6,066-square-foot amenity center. Elgin Elementary School is listed about 309 meters away.
When will The Katy at Elgin open?
The available TDLR registration was filed May 14, 2024, but it does not provide an opening date.
Also being built nearby
All of 78621- 1005 W 2nd St · Elgin Elementary SchoolFeb 16, 2026Elgin elementary school mep upgrades phase 3 — renovation/alteration — replace (5) air handling unit systems and replace all ductwork served by units · 309 m away
- 1005 W 2nd St · Elgin Independent School DistrictDec 20, 2024Elgin elementary mep replacements — renovation/alteration — demolish all ductwork and hvac units serving nw classroom wing. replace all ductwork and units. new wall penetrations for new hvac equipment · 309 m away
- 205 West Second · Elgin ISDJun 11, 2024Elgin isd | 205 west road renovation — renovation/alteration — elgin isd | 205 west road renovation · 492 m away
- 202 Depot St · City Of ElginJan 26, 2024Elgin police department sidewalk — new construction — approximately 500 sq ft of concrete sidewalk and ramps, concrete planters, handrail, curb and gutter, valley gutter, asphalt paving, and associated signs and striping · 527 m away
- 111 Lexington Road · First Presbyterian Church Of ElginAug 26, 2024Elgin community cupboard and energency housing — new construction — ground-up two-story food pantry and temporary housing facility · 538 m away
- 1112 Swenson Blvd · Tyco Capital Holdings LLCApr 13, 2026Fume hood testing room — renovation/alteration — interior renovation to construct a new fume hood testing room with supporting mep systems for equipment testing and code compliance · 558 m away
- 209 Central Ave · Tropical SnoJul 7, 2025Elgin snow cones — new construction — new ground-up construction of a restroom (8'x8') and a storage unit (10'x14'), and a 14'x4' (7 ft high) metal canopy over outdoor ice merchandisers. project will also include a snow cone stand (mobile trailer), picnic tables, sidewalks, & associated · 561 m away
- 302 W 11th Street · Sacred Heart Catholic ChurchFeb 15, 2024Sacred heart catholic church — new construction — concrete foundation , pre engineer metal building with stucco metal stud sheetrock · 578 m away
- 1002 N Avenue C · Elgin ISD Administration BuildingFeb 16, 2026Elgin isd administration building hvac replacements — renovation/alteration — replace (12) split system air conditioning units · 579 m away