New parking structures in Garland 75040
5 addresses in 75040 have permits or project filings for parking structures in the last two years. The most recent was filed at 2509 Firewheel Pkwy.
Latest filings
- 2509 Firewheel Pkwy · Sej Asset Mgmt & Investment CoAug 12, 202635398 7-eleven rev1 — renovation/alteration — interior remodel with some new equipment, remodeled restrooms, new décor, some new cabinets, enhanced building elevation and signage, clean exterior, repair parking lot, enhance landscaping, upgrade site signage and lighting
- 2105 Crist Rd · Step By Step Speacial Needs Learning CenterJun 5, 2026Step by step speacial needs learning center — new construction — construct new building to include sidewalks and parking lot
- 3205 Zion Road · City Of GarlandMar 27, 2026Chaha boat ramp at john paul jones park — renovation/alteration — replacement of parking, boat ramp, restroom, fishing pier and extension of lake bulkhead for shoreline reclamation. extended regional trail and added courtesy boat dock. added site furniture and accessible boat loading area
- 510 Stadium Drive · Garland ISDFeb 12, 2026Garland isd ph1 bp01 baseball and softball improv. - part 3 williams stadium site — new construction — new concession/ toilet room/ticketing building, field lighting, bleachers, scoreboard, site improvements with adjacent accessible parking
- 1902 Pleasant Valley Road · Tyche Garland Holding, LLCDec 22, 2025Building renovation — renovation/alteration — the project consist of the construction of a remodel of an existing cvs to a free-standing emergency room (fser) with parking on the ground level and a design area of approximately 11540 square feet
- 524 Tower Street · Llibasil Property ManagementJun 11, 2025Llibasil multi-storage project — new construction — new construction of three 4,950 sq ft shell pre-engineered metal buildings designed for future tenant space. new construction of surrounding landscape, parking & paving
- 1213 High Meadow Drive 1400 S Country Club Road · City Of GarlandMay 23, 2025James park and quail creek park improvements — renovation/alteration — replacement of playground, trails, curb ramps and site furniture. renovation of outdoor gathering space with addition of outdoor grill, seating and parking
- 4843 Naaman Forest Blvd · Garland Independent School DistrictFeb 26, 2025Naaman forest high school - additions & renovations — additions to existing building — project consists of a 9,700 square foot, 1-story type ii-b school building addition to the existing building. also includes renovations to the auditorium, cafeteria, locker rooms, dance spaces and science labs
Questions
What parking structures are being built in Garland 75040?
5 addresses in 75040 have permits or project filings for parking structures in the last two years. The most recent was filed at 2509 Firewheel Pkwy. Others include 2105 Crist Rd, 3205 Zion Road, 510 Stadium Drive.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.