New demolitions in Hutto 78634
3 addresses in 78634 have permits or project filings for demolitions in the last two years. The most recent was filed at 636 W. Front St. Suites 100-700.
Latest filings
- 636 W. Front St. Suites 100-700 · 636 W. Front St.Nov 6, 2026636 w. front st — renovation/alteration — renovation of existing space to 3 new leasable spaces. demolition of non-bearing interior partitions. addition of new non-bearing interior partitions, restrooms, and finishes. no change to building footprint or ffe
- 805 Estate Dr · City Of HuttoJun 14, 2026Hutto lake park playground — renovation/alteration — demolition and renovation of an existing playground, along with an addition of an ada accessible path from the large pavilion to both play spaces
- 636 W Front St · Ar MachiningJan 9, 2026Ar machining renovation — renovation/alteration — tenant improvement including small demolition scope, placement of new interior partition walls, hvac and mep improvements, finish selections
- 6345 Hwy · Mac Haik Automotive GroupJan 23, 2025Mac haik body shop hutto — new construction — demolition existing site construction for redevelopment into a new pre-engineered body shop and associated site work for parking, drives, detention pond, and fire lanes
Questions
What demolitions are being built in Hutto 78634?
3 addresses in 78634 have permits or project filings for demolitions in the last two years. The most recent was filed at 636 W. Front St. Suites 100-700. Others include 805 Estate Dr, 636 W Front St, 6345 Hwy.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.