New parking structures in Rockwall 75087
1 addresses in 75087 have permits or project filings for parking structures in the last two years. The most recent was filed at 701 E Interstate 30.
Latest filings
- 701 E Interstate 30 · Lakepointe Church, INCJan 12, 2026Plaza project — renovation/alteration — exterior plaza redevelopment. approximately 76,000 sq ft
- 1210 North Goliad Street · J.e.r. Chilton Ymca At RockwallNov 19, 2025Rockwall ymca addition — additions to existing building — new construction of an approximately 19,000 sq ft 1-story mixed-use building with a natatorium, exercise room and toilet rooms as well as the new construction of two approximately 27,800 sq ft and 17,000 sq ft parking lots
- 1094 TX-66 · City Of RockwallOct 15, 2024Highway 66 boat ramp — new construction — the proposed improvements include a larger parking lot (approximately 40 spaces) with lighting, improvements to a small parking lot due east of the existing boat ramp, a picnic area, pedestrian trail, and interpretive signage
Questions
What parking structures are being built in Rockwall 75087?
1 addresses in 75087 have permits or project filings for parking structures in the last two years. The most recent was filed at 701 E Interstate 30. Others include 1210 North Goliad Street, 1094 TX-66.
How can I find out when a new parking project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new parking project permit is filed.