New warehouses & industrial in Terrell 75160
2 addresses in 75160 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3201 Airport Rd.
Latest filings
- 3201 Airport RdJul 9, 2026Amazon distribution center - itx7 — new construction — the project provides a new ground up commercial building (approx 1.2m sq ft) for a regional distribution center warehouse, as well as primary and secondary guard house accessory buildings. civil is by others
- 591 Apache Trail · Wal-Mart Stores LPFeb 3, 2026Walmart distribution center 6056, modular install — new construction — new 653 square foot modular restroom for truck driver use with accessible ramp and stair access
- 301 Tanger Drive · The Shops At TerrellOct 9, 2024Skechers — renovation/alteration — interior tenant improvements to existing space for retail sales. work includes new finishes & fixtures, new lighting, new mech distribution, & new plumbing fixtures. no site modifications
- 103 Metrocrest Way · Hollingshead Material LLCJun 28, 2024Srm ready mix terminal — new construction — to upgrade the current ready mix terminal by adding a rail unloading system with a 40,000 ton cement storage dome and 600 ton cement silo that feeds two pneumatic truck loading systems
Questions
What warehouses & industrial are being built in Terrell 75160?
2 addresses in 75160 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3201 Airport Rd. Others include 591 Apache Trail, 301 Tanger Drive, 103 Metrocrest Way.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.