100 E. Ferguson St
Tyler, TX 75702 · Alterations To Second Floor Vestibule, Alterations To Second Floor Commons Area + 2 more
First Place office building vestibule and interior upgrades
TDLR records show renovations to the multi-tenant First Place office building at 100 E. Ferguson St. The latest registration, filed April 4, 2025, covers alterations to a second-floor vestibule connecting a single-story building and a 12-story building. The registration lists an applicant estimate of $338,000 for that project.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 4, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Apr 4, 2025
- since Feb 21, 2024
- Largest scope
- 1,675 sf
- Estimated cost
- $338K
- state registration
Permit & project history
4 projectsAltering an existing connecting link between a single story building and a twelve story building to serve as a vestibule. the single story building is currently being demolished under a separate contract. — first place office building
TDLR project registrationRenovation/AlterationProject Closed560 sq ft$338K est.- Project #
- TABS2025015941
- Tenant / owner
- Alterations To Second Floor Vestibule
- Design firm
- Pro
- Contact
- Pro
Drywall, ceilings, doors, and finishes — first place office building
TDLR project registrationRenovation/AlterationReview Complete1,675 sq ft$167K est.- Project #
- TABS2025004253
- Tenant / owner
- Alterations To Second Floor Commons Area
- Design firm
- Pro
- Contact
- Pro
Upgraded fixtures and finishes — first place
TDLR project registrationRenovation/AlterationProject Closed470 sq ft$82K est.- Project #
- TABS2024012090
- Tenant / owner
- Second Floor Restroom Upgrades
- Design firm
- Pro
- Contact
- Pro
Interior partitions, doors, borrowed lights, finishes — first place
TDLR project registrationRenovation/AlterationProject Closed5,333 sq ft$160K est.- Project #
- TABS2024004427
- Tenant / owner
- Tenant Improvements For Texas Comptroller Of Public Accounts
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 100 E. Ferguson St
What is being built at 100 E. Ferguson St. in Tyler?
TDLR records show renovations at the multi-tenant First Place office building, including second-floor commons and restroom upgrades and alterations to a vestibule. The latest registration is for the vestibule work.
When was the latest project at 100 E. Ferguson permitted?
The latest TDLR registration was filed April 4, 2025, under project number TABS2025015941. It is listed as Project Closed.
What is the vestibule project at First Place?
The registration describes alterations to a second-floor connecting link between a single-story building and a 12-story building, to serve as a vestibule. It says the single-story building was being demolished under a separate contract.
How much will the First Place vestibule project cost?
The TDLR registration lists an applicant estimate of $338,000 for the vestibule project. This is an estimate for that project, not the total cost of work at the address.
What other work has been registered at 100 E. Ferguson St.?
Other registrations cover second-floor commons area finishes, restroom fixture and finish upgrades, and tenant improvements for the Texas Comptroller of Public Accounts. The filings date from October 31, 2023, through October 28, 2024.
What is being renovated near Smith County in downtown Tyler?
At 100 E. Ferguson St., about 111 meters from the listed Smith County address, TDLR records show renovations at the multi-tenant First Place office building. The latest filing is for second-floor vestibule alterations.
Also being built nearby
All of 75702- 100 East Ferguson Street · Rhp Real Estate LtdFeb 12, 2024Regions bank lob tyler main — renovation/alteration — the project consists of a tenant expansion of 5,069 gsf in an existing 12 story building located at 100 east ferguson tyler, texas 75702. the build-out will consist of an open office area, one private office, three meeting rooms, breakroom, and acces
- 100 E. Ferguson Street · Rhp Real Estate LtdOct 14, 2026Alterations of allen & thauwald, pc — renovation/alteration — interior partitions, millwork, finishes, mechanical, electrical, and plumbing
- 100 N Broadway Ave · Smith CountyMay 31, 2024Smith county courthouse phase 2 new courthouse & demolition package — new construction — demolition of existing buildings and existing courthouse and construction of new courthouse · 111 m away
- 121 S Broadway Ave · Norf CompaniesOct 22, 2025Fair building gym renovation — renovation/alteration — renovation of a few offices into a small work out area for the building tenants (630 sqf) · 145 m away
- 110 N College Ave · Plaza TowerOct 2, 2026Pops pizza parlor — renovation/alteration — renovation of a previous 1,848 square foot wine bar located inside plaza tower into a pizzeria · 151 m away
- 110 North College Ave · Patriots TowerOct 5, 2026Kimley horn tyler — renovation/alteration — demolition existing conditions. construction of new private offices, conference rooms, break/copy area and open office workstations · 151 m away
- 205 W Locust St · City Of TylerMay 1, 2025It renovation — renovation/alteration — project consists of interior renovation of approximately 7,596sf of existing information technology building · 169 m away
- 410 N Broadway Ave · Moore Grocery Lofts LPJan 17, 2025Moore grocery lofts — renovation/alteration — project is the repair and maintenance of an existing apartment complex which contains two historic buildings. the scope of review is limited to the public areas including the lase office and amenities · 218 m away
- 322 E Ferguson St · Smith CountyMay 14, 2026Smith county animal shelter improvements — renovation/alteration — demolition of approximately... and conversion into green space. alternates of one room addition and a detached restroom/storage building · 225 m away
- 118 S Bois D' Arc · Christ Church EpiscopalMar 12, 2024Bell building renovation — renovation/alteration — renovation of first floor and replacement of hvac and electrical · 252 m away
- 300 W Erwin St · Marvin Methodist ChurchMar 20, 2024Sanctuary renovations — renovation/alteration — chancel renovation, new finishes, preparations for new organ · 253 m away
- 218 E. Elm St · Smith CountyApr 18, 202401-24 financial crimes intelligence center (fcic) remodel phase 2 — renovation/alteration — scope of work includes a partial interior renovation of existing office spaces, addition of an accessible restroom, and replacement of exterior windows. 3400 st ft · 273 m away