118 S Bois D' Arc
Tyler, TX 75702 · Christ Church Episcopal
Bell Building first-floor renovation in downtown Tyler
A first-floor renovation and HVAC and electrical replacement are planned at the Bell Building, according to a TDLR project registration filed March 12, 2024. The registration lists 7,500 square feet and an applicant-estimated project cost of $1.25 million.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 12, 2024
- since Mar 12, 2024
- Largest scope
- 7,500 sf
- Estimated cost
- $1.3M
- state registration
Where this project stands
In state plan reviewBell Building Renovation
7,500 sq ft · $1.3M est.
- RegisteredMar 12, 2024
- Plan reviewnow
- ConstructionApr '24 – Oct '24
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRenovation of first floor and replacement of hvac and electrical. — christ church episcopal - downtown campus
TDLR project registrationRenovation/AlterationProject Registered7,500 sq ft$1.3M est.- Project #
- TABS2024013607
- Tenant / owner
- Bell Building Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 118 S Bois D' Arc
What is being built at 118 S Bois D'Arc in Tyler?
A renovation of the Bell Building's first floor, including HVAC and electrical replacement, was registered with TDLR on March 12, 2024.
When was the Bell Building renovation registered?
The TDLR registration was filed March 12, 2024. Its project number is TABS2024013607.
How large is the Bell Building renovation?
The TDLR registration lists the project at 7,500 square feet.
How much will the Bell Building renovation cost?
The applicant's TDLR estimate is $1.25 million. This is an estimate for the project, not a confirmed final cost.
What's being renovated near Marvin Methodist Church in downtown Tyler?
The Bell Building at 118 S Bois D'Arc is planned for a first-floor renovation and HVAC and electrical replacement. Marvin Methodist Church is about 23 meters away.
Is the Bell Building renovation a new construction project?
No. The TDLR record classifies it as a renovation or alteration, with first-floor renovation and HVAC and electrical replacement.
Also being built nearby
All of 75702- 300 W Erwin St · Marvin Methodist ChurchMar 20, 2024Sanctuary renovations — renovation/alteration — chancel renovation, new finishes, preparations for new organ · 23 m away
- 110 North College Ave · Patriots TowerOct 5, 2026Kimley horn tyler — renovation/alteration — demolition existing conditions. construction of new private offices, conference rooms, break/copy area and open office workstations · 104 m away
- 110 N College Ave · Plaza TowerOct 2, 2026Pops pizza parlor — renovation/alteration — renovation of a previous 1,848 square foot wine bar located inside plaza tower into a pizzeria · 104 m away
- 121 S Broadway Ave · Norf CompaniesOct 22, 2025Fair building gym renovation — renovation/alteration — renovation of a few offices into a small work out area for the building tenants (630 sqf) · 186 m away
- 100 N Broadway Ave · Smith CountyMay 31, 2024Smith county courthouse phase 2 new courthouse & demolition package — new construction — demolition of existing buildings and existing courthouse and construction of new courthouse · 189 m away
- 235 S Broadway Ave · Briarwood Group, LtdMar 4, 2026Broadway bookstore — renovation/alteration — renovation · 250 m away
- 100 E. Ferguson St · Crest PropertiesApr 4, 2025Alterations to second floor vestibule — renovation/alteration — altering an existing connecting link between a single story building and a twelve story building to serve as a vestibule. the single story building is currently being demolished under a separate contract · 252 m away
- 100 East Ferguson Street · Rhp Real Estate LtdFeb 12, 2024Regions bank lob tyler main — renovation/alteration — the project consists of a tenant expansion of 5,069 gsf in an existing 12 story building located at 100 east ferguson tyler, texas 75702. the build-out will consist of an open office area, one private office, three meeting rooms, breakroom, and acces · 252 m away
- 100 E. Ferguson Street · Rhp Real Estate LtdOct 14, 2026Alterations of allen & thauwald, pc — renovation/alteration — interior partitions, millwork, finishes, mechanical, electrical, and plumbing · 252 m away
- 205 W Locust St · City Of TylerMay 1, 2025It renovation — renovation/alteration — project consists of interior renovation of approximately 7,596sf of existing information technology building · 277 m away
- 212 North Bonner Avenue · City Of TylerNov 17, 2026Reconstruction of pedestrian walkways, curb ramps and crosswalks · 314 m away
- 305 South Broadway Ave · Briarwood Group LtdNov 17, 2025Austin bank — renovation/alteration — remodel of existing financial facility · 360 m away