7457 West Lake Road
Abilene, TX 79601 · Veterans Land Board
Concrete flatwork and flagpole changes at veterans cemetery
About 700 square feet of concrete flatwork and a rearrangement of flagpoles are planned at the existing assembly area for the TSVCA Space Force Modifications project in Abilene. The project was registered with TDLR on September 3, 2026; the applicant’s estimated project cost is $141,000.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 3, 2026
- since Sep 3, 2026
- Largest scope
- 700 sf
- Estimated cost
- $141K
- state registration
Where this project stands
Under constructionTSVCA Space Force Modifications - Abilene
700 sq ft · $141K est.
- RegisteredSep 3, 2026
- Plan review
- ConstructionOct '26 – Jan '27
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInstall approx 700 sq ft of new concrete flatwork and re-arrange flag poles at existing assembly area. — texas state veterans cemetery
TDLR project registrationNew ConstructionReview Complete700 sq ft$141K est.- Project #
- TABS2027000276
- Tenant / owner
- Tsvca Space Force Modifications - Abilene
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7457 West Lake Road
What is being built at 7457 West Lake Road in Abilene?
The project calls for about 700 square feet of new concrete flatwork and rearranged flagpoles at the existing assembly area of the Texas State Veterans Cemetery. TDLR record TABS2027000276 describes the work.
Is a new building planned at 7457 West Lake Road?
The TDLR registration describes concrete flatwork and flagpole changes at an existing assembly area, not a new building.
When was the Abilene Space Force modifications project registered?
The project was registered with the Texas Department of Licensing and Regulation on September 3, 2026.
How much will the veterans cemetery project cost?
The applicant’s estimated cost for the project is $141,000. This is an estimate, not a reported final cost.
What work is planned at the Texas State Veterans Cemetery assembly area?
The registration describes installing about 700 square feet of concrete flatwork and rearranging flagpoles at the existing assembly area.