groundranger
Historic · latest filing Dec 2024Commercial

4570 Claire Chennault Dr. Hangar U5

Addison, TX 75001 · Addision Hangars, LLC

Aircraft hangar planned at 4570 Claire Chennault Dr.

A 37,066-square-foot pre-engineered metal aircraft hangar is planned for Hangar U5 at 4570 Claire Chennault Dr. in Addison. The TDLR project registration was filed on December 10, 2024, and describes lounges on the first level and offices on a mezzanine. The applicant’s estimated project cost is $7,586,230.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 10, 2024

Projects
1
1 filings
Latest filing
Dec 10, 2024
since Dec 10, 2024
Largest scope
37,066 sf
Estimated cost
$7.6M
state registration

Where this project stands

Finishing up · inspection next

Sky Harbour AKS

37,066 sq ft · $7.6M est.

  1. RegisteredDec 10, 2024
  2. Plan review
  3. ConstructionFeb '25 – Feb '26
  4. Inspectednow
  5. Closed

Scheduled to finish Feb 1, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Sky Harbour AKS

    Aircraft hangar of pre-engineered metal building construction. supporting areas include lounges on level 01 and offices on mezzanine level. — hangar u5

    TDLR project registrationNew ConstructionReview Complete37,066 sq ft$7.6M est.
    Tenant / owner
    Sky Harbour Aks
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 4570 Claire Chennault Dr. Hangar U5

What is being built at 4570 Claire Chennault Dr. Hangar U5?

A 37,066-square-foot aircraft hangar of pre-engineered metal construction is listed in a TDLR project registration. The description includes first-level lounges and mezzanine offices.

When was the Hangar U5 project filed?

The TDLR registration for Sky Harbour AKS was filed on December 10, 2024. Its project number is TABS2025007251.

How big is the new aircraft hangar in Addison?

The registered Hangar U5 project is 37,066 square feet.

How much is the Hangar U5 project estimated to cost?

The applicant’s estimated cost for the project is $7,586,230, according to the TDLR registration.

What will be inside Hangar U5?

The project description identifies an aircraft hangar, lounges on level 01 and offices on the mezzanine level.

What is being built near Hangar U3 in Addison?

The Hangar U5 registration describes a new 37,066-square-foot aircraft hangar at 4570 Claire Chennault Dr. Hangar U3 is listed at the same address.

Also being built nearby

All of 75001

More offices in 75001.

Email me when it passes inspection