groundranger
Historic · latest filing Sep 2024Commercial

6900 Broadway

Alamo Heights, TX 78209 · Alamo Heights - Science Renovation, Alamo Heights - Auditorium Renovation + 3 more

Alamo Heights High School renovations and field house work

Records show renovations to the science, auditorium and music buildings at Alamo Heights High School, registered on September 18, 2024. A separate project registered July 31, 2024, covered a new one-story field house and 2,850-seat east-side bleachers. The campus also has a registration for temporary classrooms and administrative buildings to be used during construction of the high school replacement.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 18, 2024

Projects
6
6 filings
Latest filing
Sep 18, 2024
since Jan 17, 2024
Largest scope
60,365 sf
Estimated cost
$8.0M
state registration

Where this project stands

In state plan review

Alamo Heights - Science Renovation

33,544 sq ft · $1.2M est.

  1. RegisteredSep 18, 2024
  2. Plan reviewnow
  3. ConstructionMay '25 – May '25
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

6 projects
  1. The science building interior renovation includes painting existing railings and hollow metal doors/frames, caulk failing joints at windows and pilasters, lighting update to led fixtures and replacement of boilers as indicated in the drawings. — alamo heights high school

    TDLR project registrationRenovation/AlterationProject Registered33,544 sq ft$1.2M est.
    Tenant / owner
    Alamo Heights - Science Renovation
    Design firm
    Pro
    Contact
    Pro
  2. The auditorium interior renovation includes updating lighting to led light fixtures, sound system, carpet and new fabric wrapped acoustical panels. — alamo heights high school

    TDLR project registrationRenovation/AlterationProject Registered9,326 sq ft$1.5M est.
    Tenant / owner
    Alamo Heights - Auditorium Renovation
    Design firm
    Pro
    Contact
    Pro
  3. The music building interior renovation includes new storage shelving, motorized shade system, lighting update to led lighting and balancing the existing hvac system. — alamo heights high school

    TDLR project registrationRenovation/AlterationProject Registered23,909 sq ft$1.3M est.
    Tenant / owner
    Alamo Heights - Music Renovation
    Design firm
    Pro
    Contact
    Pro
  4. Partial renovation to the athletic building — ad suite

    TDLR project registrationRenovation/AlterationInspection Complete1,068 sq ft$500K est.
    Tenant / owner
    Alamo Heights High School
    Design firm
    Pro
    Contact
    Pro
  5. Demolition of the existing visitor side bleachers, field house, and associated construction. construction of one-story field house building and 2,850 seat aluminum bleacher system on the east side of the stadium. — visitor field house

    TDLR project registrationNew ConstructionProject Closed7,645 sq ft$8.0M est.
    Tenant / owner
    Alamo Heights High School
    Design firm
    Pro
    Contact
    Pro
  6. 60,365 gsf of portable classroom and administrative buildings for the high school to be utilized for two years during the construction of the high school replacement — high school interim housing

    TDLR project registrationNew ConstructionProject Closed60,365 sq ft$7.5M est.
    Tenant / owner
    Alamo Heights High School - Interim Housing
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 6900 Broadway

What is being built at 6900 Broadway in Alamo Heights?

Project records list a new field house and 2,850-seat bleacher system, along with renovations to the high school’s science, auditorium and music buildings. They also list temporary classroom and administrative buildings for use during construction of the high school replacement.

What renovations are planned at Alamo Heights High School?

The science building project includes lighting updates and boiler replacement; the auditorium project includes new lighting, sound equipment, carpet and acoustical panels. The music building project includes storage shelving, motorized shades, lighting updates and HVAC balancing. All three were registered September 18, 2024.

Is a new field house being built at Alamo Heights High School?

A TDLR registration dated July 31, 2024, describes demolition of the visitor-side bleachers and existing field house, followed by construction of a one-story field house and new bleachers. The project is listed as closed.

How many seats will the new Alamo Heights High School bleachers have?

The July 31, 2024, project registration describes a 2,850-seat aluminum bleacher system on the east side of the stadium.

What are the temporary buildings at Alamo Heights High School for?

The registration describes 60,365 square feet of portable classrooms and administrative buildings for use during construction of the high school replacement. It says they are intended for two years.

What work is happening near Alamo Heights ISD on Broadway?

At 6900 Broadway, project records list high school building renovations, a field house and bleacher project, and temporary school buildings. A nearby filing at 7001 Broadway describes new construction of an Alamo Heights administrative building.

Also being built nearby

All of 78209

More demolitions in 78209, gyms & fitness in 78209, warehouses & industrial in 78209.

Email me when plan review is complete