1015 Sam Rayburn Tollway, Allen, TX 75013
Allen, TX 75013 · Cottonwood Creek Church
Cottonwood Creek Church plans 8,920-square-foot student center addition
A proposed 8,920-square-foot addition to Cottonwood Creek Church’s student center would include a multipurpose room adjacent to the existing worship facility. The project was registered with the Texas Department of Licensing and Regulation on September 23, 2024. The applicant estimated the project cost at $3,569,091.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 23, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2024
- since Sep 23, 2024
- Largest scope
- 8,920 sf
- Estimated cost
- $3.6M
- state registration
Where this project stands
CompletedCottonwood Creek Church Campus Addition Phase 2 Student Center
8,920 sq ft · $3.6M est.
- RegisteredSep 23, 2024
- Plan review
- ConstructionSep '24 – May '25
- Inspected
- Closed
Ran as a 8-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThe proposed project includes the construction of an approximately 8,920 square feet addition to the student center (multi-purpose room), located adjacent to the existing worship facility. — cottonwood creek church
TDLR project registrationAdditions to Existing BuildingProject Closed8,920 sq ft$3.6M est.- Project #
- TABS2025001607
- Tenant / owner
- Cottonwood Creek Church Campus Addition Phase 2 Student Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1015 Sam Rayburn Tollway, Allen, TX 75013
What is being built at 1015 Sam Rayburn Tollway in Allen?
A proposed 8,920-square-foot addition to Cottonwood Creek Church’s student center, including a multipurpose room. The TDLR project registration was filed September 23, 2024.
Is Cottonwood Creek Church adding a student center in Allen?
The project description calls for an addition to the existing student center, not a separate new student center. It was registered with TDLR on September 23, 2024.
How large is the Cottonwood Creek Church addition?
The proposed addition is approximately 8,920 square feet, according to the TDLR registration for project TABS2025001607.
What will be inside the Cottonwood Creek Church addition?
The project description identifies a multipurpose room as part of the student center addition. It does not provide further details about the room’s use.
How much will the Cottonwood Creek Church project cost?
The applicant’s estimated cost for the project is $3,569,091. This is an estimate listed in the TDLR registration filed September 23, 2024.
Has construction started on the Cottonwood Creek Church student center addition?
The available record is a TDLR project registration dated September 23, 2024, marked “Project Closed.” It does not state whether construction has started.