304 S. Central Expressway
Allen, TX 75013 · Steel Fab, INC
Steel Fab Offices remodel adds individual office spaces
A 5,350-square-foot remodel at 304 S. Central Expressway is planned to add individual office spaces for Steel Fab Offices. The TDLR project registration was filed December 11, 2025, and lists the status as Review Complete. The applicant estimates the project cost at $2.85 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 11, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2025
- since Dec 11, 2025
- Largest scope
- 5,350 sf
- Estimated cost
- $2.9M
- state registration
Where this project stands
Finishing up · inspection nextSteel Fab Offices
5,350 sq ft · $2.9M est.
- RegisteredDec 11, 2025
- Plan review
- ConstructionJan '26 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSmall remodel to add some individual office spaces. — steel fab
TDLR project registrationRenovation/AlterationReview Complete5,350 sq ft$2.9M est.- Project #
- TABS2026007784
- Tenant / owner
- Steel Fab Offices
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 304 S. Central Expressway
What is being built at 304 S. Central Expressway in Allen?
A remodel of Steel Fab Offices is planned to add individual office spaces. The TDLR registration describes a 5,350-square-foot renovation and lists the status as Review Complete.
When was the Steel Fab Offices project registered?
The TDLR project registration was filed December 11, 2025. It is listed as Review Complete.
How big is the Steel Fab Offices remodel?
The TDLR registration lists the project at 5,350 square feet.
How much will the Steel Fab Offices remodel cost?
The applicant's estimated cost for the project is $2.85 million.
What's being remodeled near Jeju Island Sushi Habachi & Korean BBQ in Allen?
Steel Fab Offices, at 304 S. Central Expressway, is planning a remodel to add individual office spaces. The TDLR registration was filed December 11, 2025.
Is a new restaurant opening near Ugly Dumpling on Central Expressway?
The project at 304 S. Central Expressway is an office remodel for Steel Fab Offices, not a restaurant project. Its description says the remodel will add individual office spaces.
Also being built nearby
All of 75013- 305 N Central Expressway · Jeju Island Sushi Habachi & Korean BbqNov 3, 2025Jeju island sushi habachi & korean bbq — new construction — remodel existing restaurant to be a new restaurant · 84 m away
- 210 Central Expressway South · Allen Central Market Allen TX LLCSep 18, 2024Zio al's pizza & pasta — renovation/alteration — interior remodel of existiing restaurant interior space · 167 m away
- 213 N Central Expy · T Twin Creeks Fch Tx, LLCFeb 3, 2026Ugly dumpling — renovation/alteration — interior renovation from old restaurant to new restaurant · 176 m away
- 204 Central Expressway · Allen Central Market Allen, Tx. LLCFeb 24, 2025India metro hypermarket — renovation/alteration — remodel · 177 m away
- 209 N Central Expressway · Sri Lakshmi Srinivas LLCMay 7, 2024Desi chichas — renovation/alteration — interior renovation · 180 m away
- 879 Junction · Greenwood Estates, LPFeb 17, 2026Greenwood estates — new construction — 119 buildings (200 units), 6 detached garages, 7 carports, mail kiosk and trash compactor on 14.76 acres in pflugerville · 262 m away
- 105 S. Anna Dr · City Of AllenSep 25, 2026Live oak park — new construction — new construction of 2 buildings (1-2 level and 1-1 level) for office and restaurant spaces and one stage structure. total sq ft of project will be 27,183 approx · 389 m away
- 300 N Allen Dr · City Of AllenApr 4, 2024Allen public library renovation and expansion — new construction — interior renovation and expansion to existing library facility. existing facility 53,060 sq ft (total: first and second floor). proposed expansion (first floor - 12,382 sq ft and second floor: 6,052 sq ft) · 413 m away
- 600 W Mcdermott Dr · Willbo Properties INCDec 28, 2023Wellmed at allen — renovation/alteration — interior finish out renovation of a 3,493 sq ft clinic · 431 m away
- 400 N Allen Drive · Rpgc Allen LLCNov 10, 2025Spec suite- 203 — renovation/alteration — interior finish out · 436 m away
- 400 N Allen Drive · Rpgc Allen LLCSep 4, 2025Regus - iwg 107 — renovation/alteration — interior finish out · 436 m away
- 545 W. Mcdermott Drive · Silwad INCFeb 27, 2026The happy blend — renovation/alteration — converting fast food smoothie plce to private franchisee for juices/drinks · 458 m away
More offices in 75013.